Loading…
Loading…
4,368 results • Latest
Bullah piling work below both sides foundation in connection with construction of Steel Foot Bridge over Upper Bagjola Khal at Arun Mondal Pally Ward No 18 of Baranagar Municipality District North 24 Parganas
Removal of drainage congestion from the blocked vents of Harekrishna Pally Composite Bridge at Ch. 2880 m of Upper Bagjola Khal within Ward No 18 of Baranagar Municipality and Bediapara RCC Bridge at Ch. 4440 m of Upper Bagjola Khal within Ward No 11
Supply of empty polybags filled with local earth and dumping as and when required during the monsoon of 2026 for exigencies arisen on different places of Upper Bagjola Khal and Cantonment Khal under Canals Division.
Engagement of labourers for operation of 2 vent, 5 vent and 10 vent gates near Dum Dum Park connecting Upper Bagjola Khal, Kestopur Khal and Lower Bagjola Khal during the monsoon of 2026 under Canals Division.
Supply of empty polybags filled with local earth and dumping as and when required during the monsoon of 2026 for exigencies arisen on different places of Kestopur Khal, Bhangorekata Khal, River Hooghly and River Bidyadhari under Canals Division
Maintenance and Repair of wooden bridge at Ch. 2230 m over Upper Bagjola Khal at Nirshingha Pally within Ward No. 18 of Baranagar Municipality, District North 24 Parganas under Canals Division.
M.R. to the damaged wooden Bridge over Kestopur Khal at Dharmatala Panchuria within Mouza - Dharmatala, Block - Bhangore II, P.S Kashipur, District - South 24 Parganas
Estimate for support service for cutting and Uprooting of jungle, cleaning of office campus of Galsi (I), Talit (I), Palar (I), Balgona (I), Amarun (I) and Banpas (I) Section of D.C No - III Sub-Division under D.C Division for a period of 180 days fo
Estimate for support service of Palar Inspection Bungalow (Bhatar) of D.C No - III Sub-Division under D. C. Division for a period of 180 days for the financial year 2025-26.
M/R to the existing boundary wall around the Negon (I) and Panjoya (I) Section office under Katwa Irrigation Sub-Division of Damodar Canal Division.
Running M/R to Canal and Canal Bank and removal of debris (including floating debris) near different Head/Cross Reg. gates of P.B.C. (in between Ch. 1939.00 and Ch 2731.00), in Block Mongalkote and Katwa-I in connection with Kharif Irrigation- 2026
Supplying Unskilled Mazdoor for Watching, Guarding and Operation of Regulator Gates (ch.108.00, ch.250.00, ch.290.00, ch.395.00, ch.420.00) of 14/1BC and (ch.0.00, ch.83.00) of 14/2BC At Section Office during the period of Kharif Irrigation 2026
Operation of canal regulator gates (Cross and head regulator of canal) at Ch.-2045, Ch.- 2192, Ch.- 2270, Ch.-2340, Ch. 2426, Ch.- 2475,Ch.- 2580,Ch.- 2672,Ch.- 2777 of PBC in connection with Kharif Irrigation -2026 under Nigon (I) Section of Katwa
Running M/R to Canal and Canal Bank and removal of debris (including floating debris) near different Head/Cross Reg. gates of P.B.C. (in between Ch. 1532.00 and Ch 1939.00), 14ABC (in between Ch. 0.00 and Ch 411.00) in Block Mongalkote and Bhatar,
IPM to the canal 14/1BC, 14/2B and its distributory, Minor and Water Courses under Palar (I) Section in connection with Kharif Irrigation 2026 of D.C. No-III Sub-Division in D.C. Division, Block- Bhatar Dist.- Purba Bardhaman.
M/R to Canal in connection with Kharif Irrigation 2026 for Dy. No.C of 1/BC of DBC of Talit (I) Section of DC No-III Sub Division under Damodar Canal Division.
M/R to Canal in connection with Kharif Irrigation 2026 for Dy. No. E and F of 1/BC of DBC of Talit (I) Section of DC No-III Sub Division under Damodar Canal Division.
Operation of canal regulator gates (Cross and head regulator of canal) at Ch.-1590, Ch.- 1709, Ch.- 1757 and Ch.- 1939 of PBC and Ch.60, Ch. 165, ch.212, ch.250, ch.320, ch.411 of 14 ABC in connection with Kharif Irrigation-2026-27 under Mongalkote
Supplying unskilled mazdoor for watching, guarding and operation of Regulator gates at (ch.0.00, ch.130.00, ch.151.00, ch.212.00, ch.236.00, ch.280.00, ch.307.00, ch.395.00, ch.429.00 and fall board) of 11/BC and at Section Office during the period o
IPM to the canal 1/BC of DBC and its distributory, Minor and Water Courses under Talit (I) Section in connection with Kharif Irrigation 2026 of D.C. No-III Sub-Division under D.C. Division, Block-Burdwan-I, Galsi-II, Bhatar Dist.-Purba Bardhaman.
Raising and strengthening of canal bank at different locations in between ch. 1939.00 to ch. 1952, ch. 2262.00 to ch. 2276, ch. 2494.00 to ch. 2498, ch. 2610.00 to ch. 2628 and ch.2695.00 to ch. 2698 of Canal PBC, Block Mongalkote, Katwa-I and Katwa-
M/R to Outlet structure at ch. 215.00 on R/B and at ch. 315.00 on R/B including Bank strengthening in between ch. 315.00 to 533.00 of 14/1BC of DBC in Block- Bhatar under Palar (I) Section of DC No.-III Sub-Division within D.C. Division.
M/R to the canal 14/2BC in between ch 00.0 and ch 200 of 14/2 BC of DBC within Bhatar Block under Palar Section of DC No-III Sub-Division under Damodar Canal Division.
Maintenance and repair of 13 BC of DC from ch.108 to ch.275 including Cutting of Jungle and Removal of water hyacinth, Village- From Khurtuba to Deolia G.P- Mongalkote Block-Mongalkote Dist- Purba Bardhaman under Katwa Irrigation Sub Division of Damo
M/R to inspection path in between Ch.- 2045.00 and Ch.- 2067.00 for an effective length of 650 m at L/B of Canal PBC under Katwa (I) Sub- Division within P.S- Mongalkote, Block- Mongalkote, Dist.- Purba Bardhaman during the year 2026-27.M/R to inspec
M/R to Canal in connection with Kharif Irrigation 2026 in between ch-200.00 to ch-918.00 of 1BC of Talit (I) Section of DC No-III Sub Division under Damodar Canal Division.
M/R to Canal and Canal Bank and removal of debris (including floating debris) near different Head/Cross Reg. gates of P.B.C. (in between Ch. 1939.00 and Ch 2731.00), in Block Mongalkote and Katwa-I in connection with Kharif Irrigation - 2026-27 of
Clearing and removing water hyacinth and others floating materials at Tapamirzapur khal from Tapachar sluice to Mathpara Jame Masjid for a length of 1.25 km in Block Basirhat I Ward no - 11,12 ,15 under Basirhat Municipality of Basirhat Irrigatio
Reconstruction of five vented Shyamganj Sluice over Left Embankment M.C Embankment of River Durbachati at Mouza Joteghanashyam in Block Daspur II PS Daspur Dist Paschim Medinipur in connection with Ghatal Master Plan Civil Part
Reconstruction of Baramara Sluice over Ex Zamindari Embankment along Left Embankment of River Buriganga at Mouza Dakshin Jharia GP Nich Narajole in Block Daspur I PS Daspur and Dist Paschim Medinipur in connection with Ghatal Master Plan
Clearing and removing water hyacinth and others floating materials of Palta khal from Palta sluice gate to Kabilpur Dakshinpara end of channel for a length of 4.50 km in Block Baduria of Basirhat Irrigation Sub Division under Basirhat Irrigation Divi
Reconstruction of KadamKundu Three Vented Kalyanpur Sluice over Ex Zamindary Embankment along Right Bank of River Shilabati at Mouza Narajole in Block Daspur I P S Daspur Dist-Paschim Medinipur in connection with Ghatal Master Plan Civil Part
Reconstruction of Three Vented Sluice over M.C Embankment along R/B of River Palaspai at Mouza Sitapur in Block Daspur-II P.S Daspur and Dist Paschim Medinipur in connection with Ghatal Master Plan
Clearing and removing water hyacinth and others floating materials of Maskata khal from Maskata sluice gate to Magurkhali road wooden bridge for the length of 10 Km in Ward no 3,5 under Baduria Municipality Block Baduria of Basirhat Irrigation
Reconstruction of Narayanchak Three vented Sluice over Mohankhali Circuit Embankment along Left embankment of river Durbachati at Mouza Narayanchak In Block Daspur II PS Daspur and Dist West Midnapore in connection with Ghatal Master Plan
Clearing removing water hyacinth and other floating materials from Badartala Khal in between Badartala Sluice and Aamtala Gotra for a length of 2.85 KM, at Block Basirhat I Ward no 4,3,5 and 1 under Basirhat Municipality of Basirhat Irrigation S
Annual maintenance of Cantonment Khal from 0.00 Km to 4.05 Km by clearing and removing semi-solid compact mass, water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
Annual maintenance of Beliaghata Khal from 5.000 Km to 7.520 Km by clearing and removing semi-solid compact mass, water hyacinth etc. under Canals Division form 01.06.2026 to 31.05.2027
Annual maintenance of Beliaghata Khal from 2.500 Km to 4.980 Km by clearing and removing semi-solid compact mass, water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
Annual maintenance of Beliaghata Khal from 0.00 Km to 2.480 Km by clearing and removing semi-solid compact mass, water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
Annual maintenance of Kestopur Khal from 11.00 Km to 16.485 Km by clearing and removing semi-solid compact mass, water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
Annual maintenance of Kestopur Khal from 5.50 Km to 10.980 Km by clearing and removing semi-solid compact mass, water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
Annual maintenance of Kestopur Khal from 0.00 Km to 5.475 Km by clearing and removing semi-solid compact mass, water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
Annual maintenance of New Cut Canal from 0.00 Km to 2.000 Km by clearing and removing semi-solid compact mass, water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
Annual maintenance of Circular Canal from 0.00 Km to 1.20 Km by clearing and removing semi-solid compact mass, water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
Annual maintenance of Sarala Khal from 0.00 Km to 5.00 Km by clearing and removing water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
Annual maintenance of Chowreswar Khal from 0.35 Km to 6.00 Km by clearing and removing water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
Annual maintenance of Bagjola Part-II Khal from 6.00 Km to 11.00 Km by clearing and removing semi-solid compact mass, water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
Annual maintenance of Bagjola Part-II Khal from 0.00 Km to 5.50 Km by clearing and removing semi-solid compact mass, water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
FPM of Left Bank of Keleghai River from Nagalkata (41.70km) to Chabukia (49.20km) and LB and RB of Kalimandap Khal from Kerur (0.00km) to Katakhali (7.10km) and LB RB of Debi Khal from Dubrajpur (0.00km) to Halisahar (3.30km), in Block P.S-Sabang