Loading…
Loading…
4,376 results • Latest
Geotechnical investigation including soil testing in connection with DredgingDesiltingRemoval of river bed materials from RiverJhumi for a length of 22 km and River Old Dwarakeswar for a length of 18 km in Block Ghatal and Dist. Paschim Medinipur.
M/R to Canal embankment from ch- 40.00 to ch-140.00 of WC -2600 ( L/B) of RBMC Under Uchalan II Irrigation section of Seharabazar Irrigation Sub-Division under Damodar Canal Division.
FMP at Damodar Left Embankment in between ch. 55.00 Km to 60.00 Km under Sarangpur (I) Section of Edilpur (I) Sub-Division within Damodar Canal Division during the year 2026-27.
M/R to canal embankment of Dy-14 (Ch-384 to 521) of RBMC under Uchalan-I(I) Section of Seharabazar Irrigation Sub-Division within D. C. Division.
Maintenance and repair of pipe syphone at ch-2330 of RBMC under Uchalan-I(I) Section of Seharabazar Irrigation Sub-Division within D. C. Division.
M/R to approach slab and approach Road to the Rambati bridge over Dy-11A of RBMC Under Shyamsundar Irrigation section of Seharabazar Irrigation Sub-Division under Damodar Canal Division.
M/R to canal of Dy-14 (Ch-93 to 204 and Ch-215 to 230 ) of RBMC under Uchalan-I(I) Section of Seharabazar Irrigation Sub-Division within D. C. Division.
Construction of Pipe Inlet at ch- 198.00 (Right Bank) of Dy- 15. Of RBMC Under Damodar Canal Division
M/R to Bridge Culvert at Ch. 36 of Dy-11A/1 of RBMC Under Uchalan II ( I) Section of Seharabazar Irrigation Sub Division Under Damodar Canal Division.
M/R to deck slab of road culvert at Ch. 30 of WC-2600 (R/B) of RBMC along with raising strengthening of adjacent canal banks from Ch. 25.00 to Ch. 35.00
Restoration regulator gate arrangement at ch 90.00 of Dy -07 of RBMC under Lohai (I) Section of SBID, DCD
M/R to outlet at Ch 2178 of RBMC under Shyamsundar (I) Section of Damodar Canal Division.
Reconstruction of 5 nos Pipe outlets at Ch-215 (L/B),Ch-225 (L/B), Ch-350 (L/B),Ch-392 (R/B) and Ch-392 (L/B) of Dy-11 of RBMC Under Uchalan -I Irrigation section of Seharabazar Irrigation Sub-Division under Damodar Canal Division.
Restoration of slip and subsidence on Left embankment of Pratapkhali Khal for a length of 30 m in Mouza Ganapatinagar, Block Nandakumar under East Midnapore Division
Restoration of existing Inspection Path on Left embankment of Pairatungi Khal for a length of 400 m including restoration of embankment in Mouza Abasbari, Block Tamluk under East Midnapore Division.
Renovation of Wooden bridge over Nunnan Khal near house of Sk Anowar, in Mouza Barsuri, Block Sahid Matangini under East Midnapore Division
Stacking earth and supply of empty cement Polythene bags foremergent flood restoration works during Monsoon 2026 at Pairatungi Irrigation Colony campus for Tamluk Irrigation Section in Mouza Abasbari, Block Tamluk under East Midnapore Division.
Repairing of 03 (three) nos. sluice on Right embankment of river Rupnarayan in Mouzas Amritberia, Mathuri and Nunnan, Blocks Mahishadal and Sahid Matangini under East Midnapore Division.
Repairing of 5 (Five) nos. sluice on Right bank of river Rupnarayan in Mouzas Kalikapur, Pairatungi, Kolla and Haridaspur, Blocks Mahishadal, Tamluk and Sahid Matangini under East Midnapore Division
Operating the gates of 10 (Ten) nos. sluice on Right embankment of river Rupnarayan in Mouzas Amritberia, Sankarara, Kalikapur, Pairatungi, Gangakhali, Nunnan, Mathuri, Soadighi, Kolla, Haridaspur, etc.
Stacking earth and supply of empty cement Polythene bags for emergent flood restoration works during Monsoon 2026 at Sitalpur Section Office Campus in Mouza-Bagdoba Jalpai, Block -Nandakumar under East Midnapore Division.
Repairing of Purba Gumai and Bagdoba sluice 02 (two) nos on Left embankment of river Haldi in Mouza- Purba Gumai and Bagdoba Jalpai,Block Nandakumar under East Midnapore Division.
Repairing 01 (one) no sluice on Left Ex-zamindary embankment of river New Cossye in Mouza - Bhuniakhali,Block Moyna under East Midnapore Division.
Repairing of 01 (one) no sluice on left ex-zamindary bank of river new Cossye in Mouza-Purshaghat, Block Nandakumar under East Midnapore Division
Operating the gates of Garughata Sluice,Rajakhali Sluice,Jaganathkhali Sluice,Janjia Sluice and Tripurakhali Sluice 5(five) nos on Left embankment of river Haldi during Kotal period and Monsoon 2026 in Mouzas-Teropara Jalpai,Bagdoba Jalpai etc
Operating the gates of Narayanpur Sluice, Bholsora Sluice, Kalikakhali Sluice, Danipur Sluice and Banka Sluice 5 (five) nos on Right Embankment of river Rupnarayan during Kotal period and Monsoon 2026 in Mouzas-Chandkhoa, etc.
Restoration of slip and subsidence on Left embankment of Kumbhachak khal for a length of 36 m in Mouza Natshal, Block- Mahishadal under East Midnapore Division
Repairing 2 (two) nos. sluice on Left embankment of river Haldi in Mouza Keshabpur Jalpai, Block Haldia under East Midnapore Division.
Operation of 5 (five) nos sluices gate on Left embankment of river Haldi during monsoon 2026 in Mouzas Banskhana Jalpai and Iswardaha Jalpai, Block Haldia under East Midnapore Division.
Operation of 5 (five) nos sluices gate on Right embankment of river Hooghly during monsoon 2026 in Mouzas Natshal and Tentulberia, Block Mahishadal under East Midnapore Division.
Repairing Civil Part of 2(two) nos sluice of Anandakhali and Gangamore sluice in Mouzas Banskhana Jalpai and Iswardaha Jalpai, Block Haldia under East Midnapore Division.
Stacking earth and supply of empty cement Polythene bags for emergent flood restoration works during Monsoon 2026 at Geonkhali Irrigation Section Office complex in Mouza- Natshal, Block Mahishadal under East Midnapore Division.
Repairing 04 (four) nos. sluice on Right embankment of river Hooghly in Mouzas Badur, Tentulberia and Natshal, Block Mahishadal under East Midnapore Division.
Renovation of Wooden Bridge over Topa Khal at Paramanandapur Parui Para in Mouza- Paramanandapur, Block- Kolaghat under East Midnapore Division.
Renovation of Wooden Bridge over Topa Khal at Dharapara in Mouza-Hatisal, Block- Panskura, P.SPanskura under East Midnapore Division.
Repairing of Wooden Bridge over Topa Khal at Ramnagar Shani Mandir in Mouza-Ramnagar,Block- Kolaghat, PS- Kolaghat under East Midnapore Division.
Restoration of slip and subsidence on right Ex- Zamindari embankment of River Durbachatty for a length of 50 m in Mouza Nich Khaira, Block-Kolaghat under East Midnapore Division.
Stacking earth at Harinarayanpur Manapara and Brindabanchak for emergent flood restoration works during Monsoon 2026 in Mouzas- Jiakhali and Brindabanchak, Blocks-Panskura and Kolaghat underEast Midnapore Division.
Restoration of slip and subsidence on right embankment of Bhosra khal for a length of 50 m near house of Madan Dolai in Mouza Gopal Hazra, Block Panskura under East Midnapore Division.
Restoration of slip and subsidence on right Ex- Zamindari embankment of River Durbachatty for a length of 50 m near house of Samir Mondal in Mouza Beldanga, Block Kolaghat under East Midnapore Division.
Stacking earth at Dobandy Section Office complex , near Prajabar RCC Bridge and near Kalai Bazar for emergent flood restoration works during Monsoon 2026 in Mouzas- Ranichak, Prajabar and Kalai, Blocks-Tamluk, Moyna and Panskura
Supplying 2nd hand empty cement polybags at Panskura irrigation Bungalow Godown of Panskura Irrigation Sub Division No-II for emergent flood restoration works during Monsoon 2026 in Mouza Dakshin Gopalpur , Block Panskura
Repairing of 03 (three) nos sluice at Bijoynagar, Mohanpur and Radhaban over Kherai Buxi and Buxi Khal in Mouzas Bijoynagar, Mohanpur and Radhaban ,Block-Panskura under East Midnapur Division
Repairing of 03 (three) nos sluice at Srikantha, Rajgastala and Purba Chilka over New Cossye River in Mouzas Srikantha, Rajnarayanchak and Purba Chilka ,Blocks-Moyna and Panskura under East Midnapur Division
Stacking earth on Right Embankment of River New Cossye for emergent flood restoration works during Monsoon 2026 , in Mouza- Dokanda , Block-Panskura under East Midnapore Division.
Restoration of slip and subsidence on Left Ex- Zamindary embankment of River New Cossye for a length of 110 m in Mouza- Garpurosattampur ,Block- Panskura under East Midnapur Division.
Repairing of Retaining and Wing wall of Baharkuri sluice 1(one) no on Piyanjkhali khal in Mouza-Baharkuri , Block-Panskura under East Midnapur Division.
Oiling, cleaning and greasing of 10(ten) nos sluice gate including their allied components of Kherai khal on different locations under jurisdiction of Panskura Irrigation Sub Division No-II in Mouzas Paonbanki,Guriya etc.
Restoration of slip on Right embankment of Kherai khal for a length of 90 m in Mouza- Fatechak,Block- Panskura under East Midnapur Division.
Restoration of slip on Right embankment of River New Cossye for a length of 100 m in Mouzas- Serhati and Ramgarh , Block-Panskura under East Midnapur Division.