Loading…
Loading…
417 results • Recent activity
Excavation of Water Harvesting Structure (WHS) at Choto Khalisamari mouza, Khalisamari GP, Sitalkuchi block under NMEO-Oilseeds during 2025-26 (Scheme II)
Excavation of Water Harvesting Structure (WHS) at Choto Khalisamari mouza, Khalisamari GP, Sitalkuchi block under NMEO-Oilseeds during 2025-26 (Scheme I)
Excavation of Water Harvesting Structure (WHS) at A K Paradoubi mouza, A K Paradoubi GP, Mathabhanga II block under NMEO-Oilseeds during 2025-26
In-situ soil moisture conservation by construction of Periphery Bundh (PB) at Khaterbari mouza, Hazrahat II GP, Mathabhanga I block under NMEO-Oilseeds during 2025-26
Stream Bank Erosion Control (SBEC) structure by bamboo piling and sand bag filling protection work at Mukuldanga mouza, Bara Soulmari GP, Mathabhanga II block under NMEO-Oilseeds during 2025-26 (Scheme II)
Stream Bank Erosion Control (SBEC) structure by bamboo piling and sand bag filling protection work at Mukuldanga mouza, Bara Soulmari GP, Mathabhanga II block under NMEO-Oilseeds during 2025-26 (Scheme I)