Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
4,385 results • Latest
Incasing of pipe through RMC on damaged dot nala from 111/481 Harsh nagar to 111/480 Harsh nagar under ward-05 Jawahar nagar and ward-37 Ashok nagar in zone-4.
Installation of shuttering on damaged dot nala in front of 111/1 Harsh nagar under ward-05 Jawahar nagar and ward-37 Ashok nagar in zone-4.
Construction of Puliya in Budhiya Ghat at Gajju Purwa Jajmau in Ward 96 under zone 02
Construction of road and drain from Murari Srivastava house to Adhiraj Enterprises under Zone 06 Ward 17 Naramau.
Improvement of road work from saraimita kapli gav pushpat awasthi infront house Under Ward-53 Zone-5
Improvement work of Jay Shree Krishna Park Situated in ward 07 Zone-5.
Improvement work of Hanuman Park Situated in ward 07 Zone-5.
Improvement work of Tulsi Udyan in Tulsi Vihar Under ward 18 Zone-3.
Improvement work of Park infront of H.No. C-921 Under ward 77 Barra Vishwabank Zone-3.
Construction of RCC drain from near Yadav flour mill to Hanuman temple under Zone 06 Ward 52 Sharda Nagar.
Imp. Of interlocking tiles from H.No 128/969 to 72 in ward 100 Zone 03
Construction of RCC drain from Shobhan Chauraha to near Yadav flour mill under Zone 06 Ward 52 Sharda Nagar.
Improvement work of road, footpath and drain from Rakesh Kumar Srivastava (117/O/392 a) to Guru Kripa Hostel (117/O/258) under Zone 06 Ward 52 Geeta Nagar.
Imp. Of Patch Work With H.M.P road from Keshav nagar in keshav Kunj park in Ward 18 Zone 03
one-01 ward-101 Chauk Sarfa ke antaragt Pall Lassi se Hote hue Bada Chaurha se Landmark Hotel tak Interlocking Dwara Side Patery Ka Nirmaan karya
Hot mix plant through patch work from awas vikas panki road police chauki to bagiya crossing road left side Under Ward-23 Zone-6
S/F of 25 Nos. 7.00 mtr. Long New S.T. Pole alongwith 10 sqmm 2 core armoured Cable, Automatic Switches etc. at Right Side of Sagar Market to Dalmandi Tiraha, Ward-79, Zone-01, Kanpur.
Improvement work of Park infront of H.N0-126 and 323 I block Vinayakpur Under ward 54 Zone-6.
Improvement work of road by interlocking from Ravi Kumar house to Vivek Tiwari house in New Azad Nagar Ward 46 Zone02
Imp. Interlocking tiles from Sant Ravidas Nagar and Batham ka hata malin basti in ward 14 Zone 03
Imp. Of Interlocking tiles and Damegh Nali from Block No 160/5 to Block No 171/3 in Ward 100 Zone 3
Improvement work of Road and Drain From Ram Singh house to Awadheh Singh House Near Kashi Ram Colonu in Sajri Ward 31 Under Zone02
Improvement work of road by hot mix plant from 123 MIG 2 to 15 MIG and 54 MIG till near the house of Shri K.S. Awasthi ji in Mohalla Mahabali Puram under Zone-6 Ward 23 Housing Development.
Road improvement work by hot mix plant from 45 MIG 1 to near 20 MIG 1 in Mohalla Mahabali Puram under Zone-6 Ward 23 Housing Development.
Supply of GSB at Kakadev dump for kutcha patch on various damaged roads under Zone 06
Restrengthing and Lighting work of Talab near Chandrakeshav Mandir in ward- 17 Zone-06.
Improvement work of road and drain from Dinesh Kumar House to Rajkumar in Tiwaripur Jajmau Ward 58 Under Zone02
Improvement work of road and drain from Dharmendra Chaurasia house to Ram Pal in Tiwaripur Jajmau at Ward 58 Under Zone02
Improvement of Road and Drain Infront of H/O Shyama Sharma Ji in Rajendra Nagar Ward-21 Zone-03
Improvement of Lane by I/L tiles and Drain From H.no. C-207 to C-224 in Awas vikas ward 41 under Zone- 2.
Imp of work Cross and drain From Bablu sharma house (arazi 234) to Awdhesh house in Mirzapur nayi basti in ward 19 Under Zone 6.
Improvement work of Side Patri and Drain from Laxmi Pathology To Pal General Store in Tiwaripur Ward-58 Under Zone-02
Imp. Interlocking tiles With Side patri from Chaturvedi Building to Ram Radhe Vatika in ward 65 Zone 03
Improvement work of road and drain from Shailendra Tripathi house to Arvind Shukla house in Swarn Jayanti vihar Sector B Ward 46 Under Zone02
Improvement of Road by I/L and Drain from H/O Siyaram to H/O Ravindra infront of Ratan Appartment ward-12 Zone02
Repair work on the damaged dot nala opposite Saraswati Vidya Mandir, Rambagh in Jawahar Nagar under Ward-05 Zone-04.
Construction of RCC Patiya From Gayatri Hospital To New Shukla Treading Company in Ward 22 Zone 02
Road patch repair work using HMP from Arya Nagar Crossing to Rani Ghat Crossing under Tilak Nagar Ward 61 Zone 04
Road patch repair work using HMP from Sagar Villa to Thandi Puliya under Tilak Nagar Ward 61 Zone 04
Construction work by C.C. of Heeraganj Masjid wali gali under Heeraganj Gandhi Nagar ward-49 zone-04.
Repairing and painting, tiling work and electrification work in toilet located at Geeta park in ward-05 zone-4.
Construction of platefarm for flag hoisting in ramlila park from parag dairy near deep tiraha Under Zone-5
Construction of thirty mitar high national flag work from deep tiraha near police chauki Under Zone-5
Construction of thirty mitar national flag work from ravidaspuram ramlila park Under Zone-5
Construction of platefrom for flag hoisting in ramlila park from ravidaspuram Under Zone-5
Color varnishing and repairing work from zonal office near stair Under Zone-5
Improvement of drain work mauni baba kuttiya 46b to vijay kapoor ji office Under Ward-02 Zone-5
Improvement work of road and drain by interlocking tiles from house of Akash Singh Chauhan to house of Devendra Singh in Awas Vikas 1 Mohalla M Sector under Zone 6 Ward 54 Vinayakpur.
Improvement work of side track from Awasthi General Store To Hari Lal Parakapati house and Baba Tailor to Bhabha Nagar Park in Sanigwa Swan Jaynti Vihar Ward 62 Under Zone02
Construction work of RCC drain from Prem Sewak Yadav House to Shiv Kuti house in Yashoda Nagar S Block Ward-68 Under Zone-02