Loading
Loading…
Loading…
209 results • Recent activity
1)Excavation and Brick demolition 2)PCC and RCC Works. 3)Centering and Shuttering works. 4)Steel reinforcement works. 5) Earth filling 6)Interlock paving
TRANSPORTATION OF DRINKING WATER
TENDER FOR EXCAVATION OF IRON OXIDE FROM ELEVATED POND IN AS IS WHERE IS CONDITION AND SHIFTING TO DESIGNATED AREAS OF OLD POND
SPREADING PROPER MIXING OF LIME AND SHIFTING OF STABILISED IRON OXIDE SLUDGE IN THE TEMPORARY STORAGE AREA FOR ENSURING TIMELY DISPOSAL
PROCUREMENT OF BRICK AR FOR DIGESTER
SUPPLY OF PIPE SEAMLESS CS 250MM -100MR