Loading…
Loading…
32 results • Latest
Electrical/TRD for the work of Bagnan (BZN) - Increasing of CSL of Up Main Line & Up Loop Line of BZN Station (East & West End).
Electrical/TRD for the work of Uluberia(ULB): Increasing of CSL of DN Main, Middle Line & Up Main Line at ULB Station and Provision of signalling facility and connectivity of Tower Wagon Shed with EMU Stabling line alongwith signaling facility for EMU Stabling line at HWH end.
Electrical/TRD for the work of Andul Yard : Removal of PSR 110 kmph by Yard remodeling, also improvement of Drainage system (Andul Yard : Removal of PSR 65 kmph by elimination of dimond pt crossing and Yard remodeling, also improvement of Drainage system).
Electrical/TRD work of Fuleswar Yard : Improvement of defective layout on UP Main Line for removal of PSR - 110 KMPH, Improvement of Drainage system.
Electrical/TRD for the work of 1. Proposed new 1 in 12 Cross-over for rectification of defective layout of existing Point No.55A & 55B (55B is 1 in 8.5 60Kg) and shifting of Point No.53, 54A, 54B, 56D/S, 2. Proposed new 1 in 12 Cross-over for rectification of defective layout of existing Point No.88B & 88A (1 in 8.5 Cross-over) taking off 3° Curve in similar flexure and shifting of Point No.89 and 3. Proposed 1 in 12 Cross-over for Point No.97B & 97A and conversion of existing 1 in 8.5 cross-over for Point No.90B & 90A into 1 in 12 cross-over and rectification of alignment of Point No.96B & 96A, 95D/S & 94 at West NTY Yard DN Grid.
Electrical/TRD for the work of Nimpura (KGP) : Rectification of defective layout of Point at R/Yard & faulty layout correction of points at Through yard & D-Cabin.
Provision of anti-climbing device arrangement on OHE mast/Portal/TTC for prevention of monkey menace, Provision of Anti bird disc arrangement on ST, BT & 9-ton insulator for prevention of shorting of live part and earth, Provision of 18mm copper bus bar arrangement on isolator and Provision of UV protected HDPE Mesh inside the Portal boom under Kharagpur Division.
Electrical/TRD for the work of Deulti Yard : Improvement of defective layout for removal of PSR-110 KMPH.
PDPK-Yard modification for provision of one additional Loop Line beside Line No. 10 and conversion of dead end Line No. 10 into Loop line with both side Entry and Exit facility and also conversion of 1 in 8.5 cross-over into 1 in 12 at both end of L.No.-6 for Coaching fit (Conversion of 1 in 8.5 cross-over into 1 in 12 at both end of line no.6 of PDPK Yard, Provision of one additional Loop line beside Line No.10 and conversion of Line No.10 into full length loop line with both side entry and exit facility at PDPK Yard and Provision of AT).
Santragachi : Augmentation of length of 02 nos. of lines along with extension of Pit and provision of necessary infrastructure required for examination of full length LHB rakes at Reception Yard of SRC Coaching Yard (04 nos of stabling lines & 03 nos of PIT lines with CAT work at Rec. Yard SRC).
Electrical/TRD work of Development of parcel pathway at various parcel locations namely SHM, SRC, MCA, PKU & BLS over KGP division and Shalimar: Development of parcel facilities at Shalimar. .
Provision of Bonding and earthing in FOB, Isolator switches, AT Mast, Platform shed etc. under Kharagpur Division of S.E. Railway.
Electrical/TRD work of Doro-Krishnanagar Ph: Development of new passenger halt station named Doro-Krishnanagar between BRDB & BYSA stations in PKU-HLZ section (Km.50/12-24 & 50/11-23) and Kalikakhali Ph : Development of new passenger halt station named Kalikakhali between LSGS & DSPN stations in TMZ-DGHA section (PF opposite side of traction mast).
Elect/TRD work of KGP Division: Electrification of HPCL/BLS(COIB) Siding.
Electrical/TRD work of Fuleswar Yard : Improvement of defective layout on UP Main Line for removal of PSR - 110 KMPH, Improvement of Drainage system.
Electrical (TRD) work of Replacement of old Panel Interlocking with new Electronic Interlocking at Panskura East Outer Cabin in Kharagpur Division.
Elect/TRD work of Digha : Extension of platform No. 1, 2 & 3 including PF shelter (12 Nos.) and CIB at DGHA Railway station.
Panskura Yard : Removal of PSR 75 kmph on UP Line, 110 kmph in DN Line, 110 kmph in MID line, including correction of layout at PKU east outer yard and PKU-RGX to KGP, also improvement of Drainage system.
Santragachi - Connectivity of Hospital Siding Line No.-2,5 & 6 with WCD Yard along with extension of Hospital Siding Line No. 05 & 06, dismantling of old Dy.CYM office & construction of new Dy.CYM office building and modification of Pit wheel lines with facility of Shunting Neck.
1. Bagnan : Provision of 12.0m wide Foot Over Bridge (FOB) under Amrit Bharat Station Scheme, 2. Ulberia : Provision of 12.0m wide Foot Over Bridge under Amrit Bharat Station Scheme, 3. Andul : Provision of 12.0m wide Foot Over Bridge (FOB) under Amrit Bharat Station Scheme, 4. Mecheda : Provision of 12.0m wide Foot Over Bridge under Amrit Bharat Station Scheme and 5.Tamluk : Provision of 12.0m wide Foot Over Bridge (FOB) under Amrit Bharat Station Scheme.
Electrical/TRD work of Haur Yard : Improvement of defective layout for removal of PSR - 110 KMPH , Improvement of Drainage system and Bad Bank in approach (Pt. 112A/B, 104 A/B, 111A/B and 121A/B).
POH of 01no 21.6 MVA, 132/27kV Power Transformer and replacement of 01no 132kV Double Pole Circuit Breaker at RTSS/JER under SSE/PSI/BLS in Kharagpur Division of S. E. Railway.
PDPK-Yard modification for provision of one additional Loop Line beside Line No. 10 and conversion of dead end Line No. 10 into Loop line with both side Entry and Exit facility and also conversion of 1 in 8.5 cross-over into 1 in 12 at both end of L.No.-6 for Coaching fit (Conversion of 1 in 8.5 cross-over into 1 in 12 at both end of line no.6 of PDPK Yard, Provision of one additional Loop line beside Line No.10 and conversion of Line No.10 into full length loop line with both side entry and exit facility at PDPK Yard and Provision of AT).
Santragachi : Augmentation of length of 02 nos. of lines along with extension of Pit and provision of necessary infrastructure required for examination of full length LHB rakes at Reception Yard of SRC Coaching Yard (04 nos of stabling lines & 03 nos of PIT lines with CAT work at Rec. Yard SRC).
Electrical/TRD for the work of Bhogpur (BOP) - Increasing of CSL of the UP Main and common Loop line of BOP Station.
Electrical/TRD for the work of Deulti Yard : Improvement of defective layout for removal of PSR-110 KMPH.
1. BLDA : Provision of 12.0m wide Foot Over Bridge (FOB) under Amrit Bharat Station Scheme, 2. Jaleswar : Provision of 12.0m wide Foot Over Bridge (FOB) under Amrit Bharat Station Scheme, 3. GTS : Provision of 12.0m wide Foot Over Bridge (FOB) under Amrit Bharat Station Scheme and 4. JGM : Provision of 12.0m wide Foot Over Bridge (FOB) under Amrit Bharat Station Scheme.
Elect./TRD work of Construction of DN Common Loop Line beside DN Main line at BSBP Station.
Elect/TRD work of Digha : Extension of platform No. 1, 2 & 3 including PF shelter (12 Nos.) and CIB at DGHA Railway station.
Panskura Yard : Removal of PSR 75 kmph on UP Line, 110 kmph in DN Line, 110 kmph in MID line, including correction of layout at PKU east outer yard and PKU-RGX to KGP, also improvement of Drainage system.
1. Bagnan : Provision of 12.0m wide Foot Over Bridge (FOB) under Amrit Bharat Station Scheme, 2. Ulberia : Provision of 12.0m wide Foot Over Bridge under Amrit Bharat Station Scheme, 3. Andul : Provision of 12.0m wide Foot Over Bridge (FOB) under Amrit Bharat Station Scheme, 4. Mecheda : Provision of 12.0m wide Foot Over Bridge under Amrit Bharat Station Scheme and 5.Tamluk : Provision of 12.0m wide Foot Over Bridge (FOB) under Amrit Bharat Station Scheme.
Santragachi - Connectivity of Hospital Siding Line No.-2,5 & 6 with WCD Yard along with extension of Hospital Siding Line No. 05 & 06, dismantling of old Dy.CYM office & construction of new Dy.CYM office building and modification of Pit wheel lines with facility of Shunting Neck.