Loading…
Loading…
261 results • Recent activity
Annual maintenance of E.I. of Girish Mancha, Bagbazar, Kolkata ----- Routine, preventive, corrective and breakdown maintenance of E.I along with maintenance of 500KVA Sub-station for 12 (Twelve) months.
Supply of Metal Halide lamp, ignitor and ballast as replacement of defective ones for flood light fittings at Kishore Bharati Krirangan, Survey park, Santoshpur, Kolkata-- Phase-II
Mtc of EI work at Purta Bhawan-Repair renovation and load balancing of existing dist system and replacement of diff type fittings along with proper arrangement the existing wiring system on existing cable tray and allied EI work -as and when required
Repair and replacement of existing street light arrangement and campus lighting system and allied E.I work at Purta Bhawan, Salt Lake, Kolkata-91
Construction of Light weight structure over the roof of Derozio Building for proposed Nalinikanta Bramho School of Data Science and Public Policy at Presidency University College Street Campus Kolkata 700073 during the year 2024 2025 Electrical Insta
Construction of vertical extension (4th and 5th floor) of Institute Block at the West Bengal National University of Juridical Sciences, Salt Lake, Kolkata - 700 106 -- SITC of Air Conditioning System at Cafeteria