Loading
Loading…
Loading…
6,063 results • Recent activity
Shifting/Raising of High Voltage (HV) / Medium Voltage (MV) /Low voltage (LV) lines and poles from alignment of PMGSY/CMGSY Road.
Permanent Restoration of Road from L033- Tuli to Phagoli
L029-Bageshwar Kapkot to Rainthal MR Stage- I and II, Length - 4.95 Km
Permanent Restoration on road froMm Batttal Ballian to G Padder JK14196
Shifting/Raising of High Voltage (HV) / Medium Voltage (MV) /Low voltage (LV) lines and poles from alignment of PMGSY/CMGSY Road.
Shifting/Raising of High Voltage (HV) / Medium Voltage (MV) /Low voltage (LV) lines and poles from alignment of PMGSY/CMGSY Road.