Loading…
Loading…
5 results • Latest
Balance left over work of Electrification work of Beech line (Stabling Line) at LKO Yard.
OHE modification work in connection with provision of High Level platform towards Line No. 1 at Kanpur Bridge Station Left Bank (CPB) station of Lucknow Division.
Balance left over work of Provision of 05 KVA AT in connection of Interlocking of Level Crossing gates having TVU greater than 20000 in the section of DSTE/LKO, DSTE/I/LKO & ADSTE/LKO of Lucknow Division.
Balance left over work of Provision of 10 KVA AT in connection of Interlocking of Level Crossing gates in the section of ADSTE/BSB of Lucknow Division.
Electrical Work in connection with Provision of Relay Hut for Gate Signaling at Non Interlocked Level Crossing gates ( TVU between 10,000 and 20,000) over Lucknow Division .