Procurement of Complete assembly of Vent Fan modelno.HCMB-3-50-1-3 installed in Silo in fly ash system of AHP-IV of STPS, Sarni.
Repair and maintenance of 150 mm dia main GI pipeline from plant to Sivariya Township by laying of new 150 mm dia GI pipeline over RCC pedestals.
Procurement of various handheld firefighting branches for fire service Department, SSTPP, MPPGCL, Dongalia.
Procurement of Complete HP Turbine Module and IP Turbine Module Assembly of Make BHEL For 250 MW KWU Turbine Set of Unit No. 10 and 11, PH-IV, STPS, Sarni.
Procurement of KWU Design Complete HP Turbine Module and IP Turbine Module 01 Set each for BHEL make 500 MW Turbine set of Unit No. 5 of SGTPS, Birsinghpur.
Fabrication and installation of fire water sprinkler system around the CW Chlorination plant and PT Chlorination plant at TMDOS-II, 2X660MW, SSTPP, MPPGCL, Dongalia.
Hiring of 01 number air-conditioned Jeep (6 plus 1, Pax Capicity) SUV with minimum engine capacity 1450 cc (Diesel version) with minimum 02 number air bags and ABS for use of the EE(HQ/Garage/workshop) and EE(Store)-II at STPS Sarni for 2 years
Procurement of spares for cenlub make Lube oil system of PA and FD Fan of Unit No. 10 and 11 STPS Sarni.
Manufacture and supply of Electric Resistance Welded /SAW Steel Pipes conforming to IS 3589 2001 (Grade Fe 410) for various Thermal Power Stations of MPPGCL for two years FY 2026-27 and 2027-28 on Rate Contract Basis
Procurement of Supply of water jel blanket and water jel burn wrap for different circles/division for proper fire protection and life safety measure of SSTPP, PH I and PH II, MPPGCL, Dongalia.
Assistance in pollution monitoring work along with housekeeping and round the clock watch and ward of online pollution monitoring system and other related work of Environment Management Cell at SGTPS, MPPGCL, Birsinghpur.
Work contract for conducting the periodic performance testing, calibration of power system elements of 1x500 MW unit, at SGTPS, MPPGCL, Birsinghpur, in compliance with IEGC-2023 and MPEGC-2024.
Hiring of One number air conditioned Car with engine capacity up to 1150 CC for petrol version for the Chief Chemist, STPS, MPPGCL, Sarni on monthly run basis for 2000 KM per month for a period of 24 months.
Design Engineering including Reverse Engineering Manufacturing Supply Erection Testing and Commissioning for Renovation Modernization and Uprating of two Units of RABS Hydel Power Station
Enquiry for Supply of refrigerant gas R-22 cylinders duly filled in 61kg cylinder of 61 kg each capacity for package air conditioning and ventilation system of 3x20MW BHPS-III, MPPGCL, Deolond, Distt.-Shahdol (M.P.).
Biennial Annual Maintenance Contract of Repair and Maintenance Work of Analytical Instruments at NABL Accredited Coal Testing Laboratory, STPS, MPPGCL Sarni
Availing expert service for servicing of various safety valves (Make FUKUI, JAPAN) installed in the boiler of unit no. 3 at 2X660 MW, SSTPP, MPPGCL, Dongalia.
Overhauling of various Instrumentation and control system During AOH 11 of 2x250 MW IMD 4 STPS Sarni
ENQUIRY FOR REWINDING AND REPAIRING OF 01 NO. 30 KW LP MOTOR,3 PHASE,415V INSULATION CLASS B AT 3 X 105 MW THPS ,MPPGCL,SIRMOUR ,DIST REWA
Procurement of Safety Lock-Out Box Cabinet for Permit System for PH-IV, CHP-IV, STPS, MPPGCL, Sarni.
Procurement of Various spares for SWAS system of PH-4, STPS, MPPGCL, SARNI
Procurement of insulation protection aluminum sheet (Cladding Sheet) for routine maintenance and AOH of Boiler at unit 3 and 4, 2X660MW, SSTPP, MPPGCL, Dongalia.
Rate contract for rewinding of different rating of 3-phase, 415 V, sq. cage LT induction motor of PH-I, II, III, at SGTPS, MPPGCL, Birsinghpur.
Enquiry for work contract for servicing of 1000 KVA, 11/0.415 KV UAT at BHPS-II,MPPGCL,Silpara.
Work contract of Routine maintenance of boiler firing and coal feed system, complete fan group along with LOP system, HP LP dozing system and fuel pressuring HFO and LDO pumps system of unit no. 1 to 4 of PH I and PH II at SGTPS, MPPGCL, Birsinghpur
Procurement of Spare of Mechanical Seal of Make FLOWSERVE for BFP Model No. FK6D30 and Booster Pump Model No. FA1B56 for AOH of Unit No. 11 and breakdown maintenance of Unit No 10 and 11 of PH-IV, STPS, Sarni.
Supply, installation, testing and commissioning of one (01) No., 8-passenger or above capacity elevator at New Upper Rest House, ATPS MPPGCL Chachai.
Work of re-insulation of Generator rotor coils, damper segment of Generator rotor Unit No. 4, packing, transportation from SGTPS PH-II to firm workshop n vice versa, work of Generator rotor repairing for the rectification of rotor earth of 210, SGTPS