Loading…
Loading…
1,604 results • Recent activity
Work contract for painting work in all material of cup-lock/ quick erect scaffolding material for boiler of unit 1 and 2 at 2X600 MW, SSTPP, MPPGCL, Dongalia (M.P.)
Procurement of brake shoe, coolant, restore plus, contractor tip, air hose pipe, brake pipe, B-Check kit, head light, cut off cock and valve shutoff, Air cleaner and self-starter for locomotive and wagon at ATPS MPPGCL Chachai.
Work contract for Hiring of consultant for servicing of Air Pre-Heater during AOH-2024 of Unit-1 at 2X600 MW, SSTPP, MPPGCL, Dongalia
Construction of brick masonry wall along A-Row to prevent entry of dust dirt water etc. in the area of vital equipments in MPHB LT Switch Gear Room at 3.5 m EL and 12.5 m EL at Dongaliya, Khandwa.
Work contract for installation and commissioning of plante cells battery banks at 2x600 MW, PH-I, CHP, SSTPP, MPPGCL, Dongalia
Work contract for Deposit analysis of water wall tubes for boiler of Unit 2 at 2x600 MW,SSTPP,MPPGCL,Dongalia.