Loading…
Loading…
1,606 results • Recent activity
Procurement of spares of Yokogawa make oxygen analyzer installed for oxygen measurement in furnace installed at 2X600MW SSTPP, Dongalia, Khandwa
Work Contract for Analysis of Ash samples (Bottom Ash,dry fly ash and pond ash Samples),Ground water samples and soil samples of STPS MPPGCL Sarni
Procurement of spares for Siemens make 0.4 kV 630 Amp. Air circuit breaker installed at 4x210 MW, CHP I, SGTPS, MPPGCL, Birsinghpur
Construction of boundary wall with GI profile sheet at 1x660 MW, STPS Sarni.
All in One PC (V2) (Q2) (3 (3 ))
Supply of 3 units of 3TR capacity, split type Air Conditioners alongwith installation for cooling of generator automatic voltage regulator panel of 210MW ATPS, MPPGCL, Chachai