Loading…
Loading…
1,285 results • Recent activity
For Testing of protective system of power transformer 11 KV Switchgear 33 KV control panel in the area of 33 KV Jankipuram in the Jurisdiction of SE Technical Jankipuram zone Lucknow against M and R 2025 26 Head
Substation Clamps/Connectors (Q3) (3 (3 ))
Fuse Wire Used in Rewirable Type Electric Fuses up to 650 Volts Conforming To IS 9926 (Q3) (3 (3 ))
Brass LV (Bushing Rod) Metal Parts 260x20 mm, Brass LV (Bushing Rod) Metal Parts 290x30 mm, Brass LV (Bushing Rod) Metal Parts 350x42 mm, Brass LV (Bushing Rod) Metal Parts 205x12 mm, Brass HV (Bushing Rod) Metal Parts 135x12 mm
Loading/Unloading and Replacement of various capacity damaged small And medium capacity distribution transformers for 12 months installed in the work area of (Assistant Engineer 11KV And LT,BKT) of 33/11 KV Sub Station, ITAUNJA/KATHWARA/KUMBHRAWAN
Loading/Unloading and Replacement of various capacity damaged small and medium capacity distribution transformers for 12 months installed in the work area of (Assistant Engineer 11KV and LT,BKT) of 33/11 KV Sub Station, SADAMAU/MAMPURBANA/BAURUMAU