Loading
Loading…
Loading…
3 results • Recent activity
Design, Supply, Installation, Testing and Commissioning, Training and CAMC of X-ray Baggage Scanner, Door Frame Metal detector (DFMD), Hand Held Metal detector (HHMD), Q-Managers and Ladies frisking booth for Metro Stations of NMRP Phase-II
Design and Construction of Elevated Metro Viaduct of Length 4.8 Km and 1st Level Six Lane Elevated Road of length 4.7 Km from Ramwadi to Tuljabhavani as a part of Corridor 2B PMRP Phase 2.
Design and Construction of Elevated Metro Viaduct of Length 1.123 Km,Two Metro Stations Kothrud Bus depot and Chandani Chowk, Double Decker flyover at Kothrud Dep. and FOB to NH Vanaz to Chandani Chowk Line2A ,Stabling Lines PCMC Nigdi of PMRP.