Loading…
Loading…
122 results • Latest
Wheel profile meter
Joggled Fish Plate
Reagent Grade Distilledwater (Q3)
Tetra off Air Repeater
Strap Hanger Assembly
Pressure regulator with filter for VCB
Licensing of Co-Branding Rights of Selected Metro Stations of Nagpur Metro Rail Project for a period of 05 years.
Industrial Safety Helmet (V3) ISImarkedto IS2925 (Q2)
All in One PC (V2) (Q2) (3 (3 ))
Set of tools for removal and Insertion
Auction of Unserviceable/Scrap Material released under Phase-II Electrical Utility Shifting Nagpur Metro Rail Project.
HVAC Intermediate Relay
J Clamp for ballastless track
Licensing of Property Business Spaces having area more than 100 sqm. at selected Metro Stations of Nagpur Metro Rail Project for a period of 15 Years.
Construction of 06 (Six) numbers of Elevated Metro Stations of Thane Integral Ring Metro Project (1. Dr. Kashinath Ghanekar Natyagruha, 2. Manpada, 3. Dongripada, 4. Vijay Nagari, 5. Waghbil and 6. Waterfront).
CONSUMABLE ITEAMS
Aluminium Extendable Ladder
Supply of Forged wheels
Engagement of General Consultant for Thane Integral Ring Metro Project.
Hand Dryer (V3) (Q2)
Design, Supply, Installation, Testing and Commissioning, Training and CAMC of X-ray Baggage Scanner, Door Frame Metal detector (DFMD), Hand Held Metal detector (HHMD), Q-Managers and Ladies frisking booth for Metro Stations of NMRP Phase-II
Discharge Rod for 25 KV
Lighting Work for Parking and Other Area at Ground Level of Central Park and Pethpada Metro Station of Navi Mumbai Metro Line-1 (On Behalf of CIDCO).
Repair and maintenance related to civil works of structures of 11 nos. Metro Stations, 14 Km Viaduct, Taloja Metro Depot and Two Receiving Sub Stations (R.S.S.) of Navi Mumbai Metro Line - 1 for a period of Two years
Rectification of Cable Dressing Using Steel Strips and Sleeves, Tightening of Nuts and Bolts, And Associated Works for CBTC/CCTV Access Points Installed On Various 25kv Ohe Poles Along Reach-1 and Reach-3 Sections
CLOUD 80 2-4 D Sodium Salt 80% Tec 1 kg
D Shackle 25mm, 3 Ton, D Shackle 20mm, 3 Ton, D Shackle 16mm, 3 Ton, Delivery Days D Shackle 12mm, 3 Ton
Molub Alloy 243 Arktic Grease
Stationary Consumable Items
Selection of Consultant for Preparation of Transit Oriented Development Plan, Local Area Master Plan and Multi-Modal Integration Plan for Thane Integral Ring Metro Project
UPS Centrifugal Fan
Consultant for preparation of AAR and DPR of Nagpur Metro Phase III
APPOINTMENT OF AGENCY FOR AIR TICKET BOOKING DOMESTIC and INTERNATIONALSERVICES FOR MAHA METRO OFFICIALS
Continuous rail thermometer Automatic data logger
Providing services of (a) Mechanized Housekeeping, cleaning, (b) Ticketing (TOM/EFO Management), (c) Security Services for Stations of Line-1 (11 Stations)
Gear Case Oil
Come along Clamp CW, Come along Clamp MW, Come along Clamp OPC
Pulley Single Sleeve 4", Pulley Single Sleeve 6"
Adhesive (M to M)
Open End Torque Wrenches
Heavy Duty Wooden Blocks
Anti Skid Tape
Office Stationery
Supply, Installation, Testing and Commissioning of Networking equipment at Mihan and Hingna Depot
Lithium Ion Battery for drill Machine
Shifting of various Electrical Utilities in Reach-1, Reach-2 and Reach-3 Section of Nagpur Metro Rail Project.
Development and Operation of Parking and Commercial on Land admeasuring 7202 Sq. Mt. bearing Kh. No. 169, Mz. Sitabuldi on Public Private Partnership Basis.