Loading…
Loading…
103 results • Latest
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 2 (Two) nos 25 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at KADIRPUR Water Supply Schem
Design, Fabrication, Supplying, Installing, Commissioning and 3 (three) months Trial Run of 45 m3hr. capacity of Iron Elimination Plant (Pressure Type) with provision of polishing unit and Construction of 3.60 mtr. X 3.00 mtr. Blower room of Head Wo
Laying of Dedicated pipe line for improvement of functionality and Design, Supplying. Fabrication, Erection Commissioning including 3 (three) months Trial Run of 135m3 hr. capacity Pressure type IRON ELIMINATION Plant with backwash water disp
Laying of Parallel/ Dedicated Pipeline for better Functionality at Durgapur Gobindapur Area of JOTGOPALPiped Water Supply Scheme at Englishbazar Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe providing FHTC forSANKAIL piped Water Supply Scheme at Gazole Block in the District of Malda under Malda Division, P.H.E. Dte.
Laying of Parallel/ Dedicated Pipeline and Providing Common Manifold for better Functionality at ANANDIPURPiped Water Supply Scheme at Englishbazar Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.