Loading…
Loading…
Found 24 active tenders
24 results • Latest
Civil Protection Work of Bin Super Passage.
Slip clearance (by manual means) of earth and boulders including disposal complete as directed by the Engineer-in-charge including supply of all materials, labour and T&P etc. required for proper completion of the work
Annual Maintenance of Unit 1 and Unit 2 and their associated equipments of Vyasi Power house Hathiyari
In-situ repairing of underwater parts (MIV and its inlet & outlet pipelines).
Outer Painting Associated repair work of Type P IV Residences of UJVN Limited at Yamuna Colony, Dehradun
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed All kinds of soil -(2.1.1)
Supply of Transformer oil
New Transformer oil Nepthenic base IEC:60296
Major overhauling and repair of Unit-B of Kulhal Power Station (3X10 MW)
Pre- shutdown Survey of machine
Geotechnical investigations, Field / In-Situ Testing at Sirkari Bhyol Rupsiabagar (SBR) Hydro- Electric Project (120 MW), Munsiyari , District Pithoragarh
Diamond core drilling vertical hole (with 0-10 angle from vertical) of desire depth with double barrel core samplers for geological & geotechnical investigation in the project area and around the project alignment of Sirkari Bhyol Rupsiabagar HEP (as given below in desired mode) as per specification of NX size, having depth as per Direction of Engineer In Charge including all cost of material, labour, T&P etc. complete in all respect, with a core recovery as per relevant IS I.S Specifications and boxing (Making and supplying of sal wood/ local wood core boxes with dummy (core loss), wooden blocks and packing materials as per IS Specification number 4078 - 1980 with latest amendments, if any, including all cost of labour, materials, carriage and T&P complete in all respect with painting and writing, marking etc) levelling and transportation of the core etc. the above work also includes water permeability test (Double packer method) at every 3.0 to 5.00 M depth in ascending and descending order including all cost of materials, labour, T&P others equipment’s etc. complete in all respect required for performing the test including and cost of geological logging of drilled holes as per Indian standards and submission of report complete in all respect to full specification of Engineer-in-Charge. As per ToR Sl no 3 (A) & (B-1) Location :- Surge Shaft (70m), Pressure Shaft (180m)