Loading…
Loading…
81 results • Recent activity
Estimate for Internal clearance of silt and weed growth and uprooting of Jungle from RD 00 to tail (RD 32000) of Kotla Drain before monsoon season 2026
Estimate for Laying AC Pressure Pipe Lines with Pump House (including cost of pumps) from Low Laying/Water Logged Area of Village Jainwant and Kasampur to U.D.D. to prevent agriculture Land and Abadi area.
Estimate for Construction of sump wells and laying AC pressure pipeline for dewatering the flood water into Nuh Drain from Village Bainsi.
Laying AC Pressure Pipe Line with Sump from Low laying/Water Logged Area of Village Siroli to New Kot Drain to prevent agriculture land and abadi area.
Estimate for Construction of 2 No. sump well and laying AC Pressure Pipeline for dewatering the flood water into dabalu minor from village Gangoli.
Rehabilitation of Sondh link Drain from RD 27750 to 37650 including Pucca structures