Loading…
Loading…
14,573 results • Recent activity
Supply of Deaerator Package as per MR, Sitework of Deaerator Package as per MR, Transportation of Deaerator Package as per MR, Mandatory spares for Deaerator Package including freight of mandatory spares as per MR
ADULT RIGID CYSTOSCOPE WITH ACCESSORIES
CS FLANGE 2.1/16 x 2" LP THREAD, DOUBLE STUDDED ADAPTER FLANGE
Custom Bid for Services - Hiring services of Ultrasonic thickness survey of Station process piping crude oil pipeline at Pump Station 10 Fire Water Ring Piping and 1200 KL Balance Tank at Pump Station 10 of Barauni P10 Barauni of OIL INDIA LIMITED at.. Similar Category Facility Management Services - LumpSum Based
BATTERY BANK, NI CD, 400AH, 175 CELLS, KPM for CPP unit, BATTERY BANK, NI CD, 50AH, 306 CELLS, KPM for CPP unit, BATTERY BANK, NI CD, 535AH, 175 CELLS, KPM for DHDT unit, BATTERY BANK, NI CD, 56AH, 306 CELLS, KP for DHDT unit, BATTERY BANK, NI CD, 125AH, 175 CELLS, KPM for DHDT, BATTERY BANK, NI CD, 125AH, 175 CELLS, KPM for Ref 1 and 2 unit, location 220V B charger SS 06, BATTERY BANK, NI CD, 125AH, 175 CELLS, KPM for Ref 1 and 2 unit, location 220V B charger SS 08, ITC of BATTERY BANKs, MCCB, 415V, 32A, 3P, 50KA, 1 SEC, MCCB, 63A, MCCB, 3 POLE, 160A, CABLE, TINNED COPPER Uninyvin cable, U4, 21.5 SQMM, CABLE, TINNED COPPER Uninyvin cable, U1, 40.7 SQMM
Air Quality Monitoring Service - Indoor Area; Contract for collection and analysis of Stack Flue gas samples from 13 stacks (to be done bimonthly as per guidelines); Bi monthly, Air Quality Monitoring Service - Indoor Area; Plant, Collection and analysis of Incinerator Flue Gas; Bi monthly, Collection and analysis of Incinerator Flue Gas; Once in six months, Collection and analysis of Flue Gas ex Diesel Genset Engine Stacks; Yearly, Collection and analysis of Treated Effluent; Monthly, Collection and analysis of Ground Water; Yearly