Loading…
Loading…
298 results • Latest
Upgradation of existing two- lane with paved shoulders carriageway of Nagaur-Bikaner Section of NH-62 from design km 161/000 to km 270/245 to Four Lane with paved shoulder in state of Rajasthan on BOT (Toll) Mode
Consultancy Services for Authoritys Engineer for Supervision of Widening of Existing 2 Lane to 4 Lane with Paved Shoulder from Km. 32.950 to Km. 55.400 (Thavar to Jherda Section) of NH 168A in the State of Gujarat on EPC Mode
Consultancy Services for Feasibility Study and Preparation of Detailed Project Report DPR for 4L 6L of Kathipudi to Ongole Stretch of NH 216 from Km 0.000 to Km 390.000 in the state of Andhra Pradesh
Construction of 6 no. of Mangobandhar, Kendua,Tolesono,Jhajha, Narganjo and Bhairoganj Bypasses (Total length 19.450 km) along with 2 no. of DLP free sections (total length 21.821 km) to 2L plus PS standard of NH-333A in the state of Bihar.
Consultancy Services for pre. of (DPR) for Widening 4LPS fromBahraich head Qtr. at Km.263.000 to SanaiChauraha atkm433.000,Maharajganj to kaptanganj Km.505.000 toKm.537.000 and Kaptanganj to PadraunaKm.537.00to564.00of NH730 in the State ofUP.
Consultancy Services for preparation of Detailed Project Report for Widening to two lane with PS from Chare to Akhegwo (Length 244 km) on NH 202 in the State of Nagaland
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF THE WORK OF CONSTRUCTION OF 4-LANE WITH PAVED SHOULDER OF SRI MUKTSAR SAHIB BYPASS FROM EXISTING KM 269.960 of NH-354 TO EXISTING KM 39.280 OF NH - 754 IN THE STATE OF PUNJAB.
Supply, Installation Testing, Commissioning, Operation and Maintenance of Centralized Control and Monitoring System (CCMS) for Highway Lighting on National Highways in the State of Jharkhand, on Five (05) Year Contract Basis
Widening and strengthening of stretch from Hansdiha (Design Ch 92.380 km) to Chopa More (Design km 129.370) of NH-133 to 4 lane with paved shoulder in the State of Jharkhand under EPC mode
Rehabilitation and Upgradation of existing road between km 0.00 to km 76.00 (Bhairoghati-Nelong-Naga-Sonam-PDA-Medikey) from existing/single lane to double lane with paved shoulder specification on road Bhairoghati-Nelong-Naga Sonam-PDA-Medikey secti
Consultancy Services for Authority Engineer for supervision of Widening to 4 Lane PS from Km 347.500 Intersection with NH 48 at Km 116.800, Near Sira to Km 367.700 Near Badavanahalli including bypass to Sira town of NH 69 in the state of Karnataka on
Consultancy Services for Authority Engineer for supervision of Widening to Two Lane Paved Shoulders from Km 0.000 Mudigere to Km 26.326 Mugutihalli of NH 173 Mudigere Kadur Section in the State of Karnataka on EPC Mode in NH O Annual Plan 2023 24
Rehabilitation and Upgradation of Two lane Road with paved shoulders on Malegaon Missing Link section of NH461B from Akola Naka to Junction with NH 161 at Malegaon Bypass (from km 0.00 to 3.00 Total Length 3.00 km) and 0.00 to 0.460 length of NH753C
Consultancy Services for feasibility study and preparation of (DPR) for Widening/Upgradation to 2L/4L PS from barabanki to Lakhimpur of NH727H (Except from Dewa to Fatehpur (Km 19.000 to Km 39.000) in the State of Uttar Pradesh.
Consultancy Services for Preparation of DPR for widening to Four lane with Paved Shoulder from Two lane with Paved Shoulder from Km.0.00 to Km.118.470 Kalaburagi Wadi Yadgiri Kadechur Section of NH 150 in the State of Karnataka
Short Term Improvement and Routine Maintenance work Road Pavement Repairs work on Section Dhasa-Gadhada-Botad road (Between Km. 74/00 to 119/500) of NH-51 in the state of Gujarat.
Short Term Maintenance on NH-351G Between Km. 169/220 to Km. 203/620 (Kamlapur-Chotila Section) in the state of Gujarat.
Short Term Improvement and Routine Maintenance of Km. 78/700 to 116/600 (For Amreli-Babra section) of NH-351G in the state of Gujarat.
Short Term Maintenance of NH-351G Km. 0/00 to 62/200 Nageshree-Khambha-Chalala Road in the state of Gujarat.
Short Term Improvement and Routine Maintenance of Km. 34/480 to 74/00 (for Vartej Dhasa section) of NH-51 in the state of Gujarat.
Reconstruction of Bridges Major Bridge at Takera at Ch 184.200 and four Minor Bridge at Ch189.400, 190.600,191.400 and 193.200 on NH-57 in the state of Odisha on EPC mode
Consultancy Services for Authority Engineer for supervision of Widening of existing 2 lane to 4 lane with paved shoulder from design Km.25.15 to km. 56.70 except km. 52.70 to 53.50 of NH169 Nellisara Camp to Thirthalli of NH 169 on Shimoga Mangalore
Consultancy Services for Authority Engineer for supervision of Widening to 2L PS from Km. 0.00 to 37.850 except 24.45 To 27.20 of NH 766C Byndoor Ranebennur Section in the State of Karnataka on EPC mode
One time Improvement of existing left over (Bypassed) Road stretches from Km 354.531 to Km 358.842 of Kurnool - Chittoor - Ranipeta Road of NH-40 (Chittoor Town limits) in State of Andhra Pradesh on EPC mode under Annual Plan 2026-27
Rectification of 2 nos.of Blackspots at Akkammagarla temple crossing road AP (03) 248 and KLD Circle Road AP (04) 200 on NH 544DD in the State of Andhra Pradesh
Short Term Maintenance of MP/UP Border-Chitrangi Section of NH-135C from Km 0.00 to Km 54.00 (Total Length 54.00 Km) in the State of Madhya Pradesh
Widening and Strengthening of Single and Intermediate lane to 2 Lane with paved shoulder from existing Chainage (Km 53.873 to Km 59.700) Design Chainage (Km 33.565 to Km 38.943) (Design length 5.378 km) on NH-507 in the State of Uttarakhand
Consultancy Services for Preparation of DPR for Widening to 2lane from km 31.0 to km 46.0 and km 63.0 to km 97.0 of NH 305 in the State of Himachal Pradesh.
Widening to 2 Lane paved shoulder from Existing Chainage 12.000 to Km 40.500 Badhwala to Lakhwar Bend Realignment from km. 12.00 to 31.122 on NH-507 Length-25.660 Km in the State of Uttarakhand on EPC Mode.
Short term maintenance Mandla Nainpur from Km 0 to Km 25 and Km 75/6 to 95 km (Total Length-45.6Km) of NH-543 in the State of Madhya Pradesh
Widening to 4L PS configuration from km 6.600 to 16.300 of the Khamgaon to Shegaon section of N H 548C in the state of Maharashtra on EPC mode
widening of existing Single / Intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (Tyuni to Bataghat) of NH-707Ain the State of Uttarakhand. (Length-175 km).
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from Km. 0.00 to 80.00 Ghat to Udiyari Bend of NH-309A in the State of Uttarakhand. (Length 80 km).
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from Km. 0.00 to 235.00 Jyolikot to Karanprayag of NH-109 (Old NH 87Ext) in the State of Uttarakhand.(Length- 235 km).
Consultancy services for Authoritys Engineer for supervision of Balance work of the rehabilitation and upgradation from Km 33.860 to Km 67.150 of the Naldurge to Akkalkot section of NH 652 to 2 Lane with paved shoulder configuration in the state of M
Consultancy services for Authoritys Engineer for Supervision of Work of Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to two lane with paved shoulders in the State of Madhya Pradesh on EPC Mode
Widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (Bataghat to Maletha) on NH-707A in the State of Uttarakhand. (Length 136 km).
Maintenance Works of NH-730 from Ch 537.470 to Ch 564.750 under Short Term Maintenance Contract in the state of Uttar Pradesh
Maintenance Works of NH-730 from Ch 454.000 to Ch 470.900 and Ch 474.000 to 484.000 under Short Term Maintenance Contract in the state of Uttar Pradesh
Maintenance Works of NH-730 from Ch 484.000 to Ch 505.000 under Short Term Maintenance Contract in the state of Uttar Pradesh.
RFP For Construction of Gonda Bypass (western part) of NH 330B to four lane with paved shoulder configuration design length of 20.570 Km under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh
Consultancy Services for feasibility study and preparation of (DPR) for widening to 4L form Km. 0.00 to 40.00 Sitapur- Kurain of NH-330D in the State of Uttar Pradesh.
Construction of Bypass Road to Aska Town on NH-157 in the state of Odisha on EPC mode
Consultancy Services for Authority Engineer for supervision of i Widening to 4L PS of NH 548B from Km. 80.000 Near Murgundi to Km. 140.200 Near Chikkodi excluding length from Km. 118.450 To Km. 128.450 in the State of Karnataka on EPC mode and ii Con
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (Badwala to Lakhwar Bend) (realignment from km 12.00 to 31.122) on NH-507
Construction of New Major HL Bridge across River ONG at Km. 43.500 on NH-26 in the State of Odisha on EPC mode
Construction of Uni-Directional twin tunnels including approach roads across Fotu La Pass on NH-01 (Leh-Kargil Highway) in the Union Territory of Ladakh
Upgradation to 2 Lane with Paved Shoulders of Naliya Narayan Sarovar section from design km 220.773 to km 288.987 of NH 41 in the state of Gujarat on EPC mode.
Upgradation to 4 Lane with Paved Shoulders with Divided Carriageway from Design km 0.000 to km 37.087 of Pardi NH 48 Junction Sukesh Nanapondha Kaprada section of NH 848 in the state of Gujarat on Hybrid Annuity Mode.
Upgradation of Chitrod-Rapar-Balasar section of NH-927C to two-lane with paved shoulders from design km 0.00 to km 57.848 in the State of Gujarat on EPC mode.