Loading…
Loading…
775 results • Recent activity
Maintenance works through STMC on NH-17 and NH-427, under PWD, Guwahati NH Division in the state of Assam under Annual Plan 2025-26.
Construction 4lane-PS GGM-Alwar road (NH-248A) Nuh-FZR Jhirka up to RJ Border (46.95-95.97(DC.96.980) excld 50.900-54.46 nd 61.900-65.18) strength-imp of existing road 6.84 length in Malab vill (50.900-54.46) Bhadas vill (61.900-65.18) Nuh Haryana
Maintenance works through STMC for the year 2025-26 from Km 25/000 to Km 54/000 (Daloitola to Doulasal section) on NH-427 (Total length 29 Km.) under PWD, Guwahati NH Division in the state of Assam under Annual Plan 2025-26.
Unbranded Writing 0.7 mm Plastic Pen
Good Quality Envelope 80 gsm Light Yellow Pocket shape envelope, Good Quality Envelope 80 gsm Light Yellow Pocket shape envelope of dimensions ( In mm) 220 x 310
Kangaro Box of 1000 Staple Pins of size 23/24