Loading…
Loading…
785 results • Recent activity
Planting of Trees and their Maintenance for one Year for the work of Widening from DL to four lane from km 170/2 - 172/0 (km 308/4-302/6 of NH 948), Widening from DL to DL with paved shoulder from km 176/0 - 204/8 (km 302/6 - 273/8 of NH 948) includi
Up-gradation and Construction to 2L with PS of Chanderi-Pichhore road section of NH-346, from design Km 237.600 to Km 292.750 (Design Length-55.150 Chanderi link bypass) in the State of Madhya Pradesh
Rehabilitation and Upgradation of Sendhwa to Khetiya (MP/MH Border) Section from km 0/000 to km 55/600 of NH-752(G) to two lane with paved shoulders in the State of Madhya Pradesh on EPC Mode.
Upgradation and reconstruction of Mandla - Nainpur Section of NH 543 from Km 190/400 to Km 236/500 to two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC mode
Permanent slope protection measures at landslide prone location from Km 486.825 to Km 487.095 at Malpem on NH-66 in the State of Goa under Annual Plan 2025-26.
STMC of Hyderabad-Bhupalapatnam Section of NH 163 from Km 159.0 to 165.4, 186.0 to 214.2, 231.0 to 231.420, 232.580 to 236.0, 247.0 to 265.4, 290.5 to 294.6 in Telangana