Loading…
Loading…
765 results • Recent activity
Rehabilitation Upgradation of existing highway to Two Lane Four Lane of Karad Tasgaon (From KM 0/000 to Km 58/830) Section of NH-266 on EPC mode in the State of Maharashtra. Reg. Repairing of Approach Road
Widening from Intermediate Lane to Two lane and strengthening from Km 2/5-4/0 and 5/0 -12/0 of Kurinjipadi - Palur road SH-252 including Re-construction of culvert at km 5/8, km 8/10, km 9/8 and construction of Retaining wall at km 7/6
Strengthening from km 5/4-11/6 of Kallakurichi- Sankarapuram Road (Via) Kanchirapalayam (SH-245)
Construction of High Level Bridge at km 5/2 of Banvaram - Sendamangalam - Ganapathipuram Road (M-577) in lieu of existing causeway
Widening from 2L to 2LPS and Strengthening from km 74/0-79/250 of Abdullapuram-Asanampattu-Alangayam-Tirupattur Road including Widening of Box Culvert at km 75/6(SH-122)
Consultancy services for AE for supervision of Rehabilitation and upgradation from of Kolde to Visarwadi (Near Junction with NH-6) section of NH752G (total length -4.40) to 2LPS/ four lanes in the State of Maharashtra on EPC mode.