Loading…
Loading…
5,084 results • Latest
Controller for Global Navigation Satellite System (GNSS) (Q3), Receiver for Global Navigation Satellite System (GNSS) (V1) (Q2) (3 (3 ))
Supply of C02 2kg, Supply of C02 4.5kg, supply of ABC 4kg, Supply of ABC 6kg, Supply of ABC 9kg, Refilling and HTP Testing of C02 2kg, Refilling and HTP Testing of C02 4.5kg, Refilling and HTP Testing of C02 4.5 kg, Refilling and HTP Testing of ABC 4kg
Fume Exhaust System with Scrubber or Fume Hood with Scrubber (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2026/B/7115378 Dated : 15-01-2026 Bid Document 1/10, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 34400 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be 2/10 in favour of Beneficiary, wherever it is applicable. Beneficiary : DIRECTOR CSIR INDIAN INSTITUTE OF CHEMICAL BIOLOGY, Department of Scientific and Industrial Research (DSIR), Council of Scientific and Industrial Research (CSIR), Ministry of Science and Technology (Director, Csir-iicb)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Firefighting system; Service Provider
Hoshizaki 4 Door Vertical Reach In Chiller - HRW-127MS4, Hoshizaki 2 Door Vertical Reach In Chiller - HRW-77MS4
IP IR Bullet Camera 2MP, IP IR Dome Camera 2MP, IP IR Bullet Camera 4MP, 16 Channel NVR, 8 Port PoE Gigabit Switch with 2 SFP, 8 TB Hard Disk, 4 Port Gigabit Switch, Multimedia SFP Module, LIU 8 Port, LIU Patch Cord, Fiber Core Multimedia Cable, 3 Core 1.5 sq.mm Armored Power Cable, 8 Port Patch Panel, RJ45 Connector, Weatherproof Box, 2U Server Rack, 40 LED Android Display, 32 LED TV, HDMI Cable, CAT6 Cable, 64 Channel NVR, Installation commissioning of complete CCTV