Loading…
Loading…
62 results • Latest
Ratlam Division - Electrical work in connection with Augmentation of water supply arrangement at various 12 stations in connection with Simhastha 2028.
Ratlam Division - Upgradation of station including circulating area, water supply and approach roads at Ujjain, Laxmibai nagar and Naikheri (Simhastha 2028)
Ratlam division - Electrical work in connection with (1) Barlai - Additional common loop line at in connection of Simhastha 2028. (2) Tajpur - Additional loop line at in connection of Simhastha 2028. (3) Naikheri - Yard Remodeling with additional loop and stabling line in connection of Simhastha 2028.
Ratlam Division - Ujjain- Electrical work in connection with improvement to circulating area and drainage towards PF 1 and 8. (Simhastha-2028).
TRD Works in connection with Providing additional loop line at Sanosara
Rewiring of Various service buildings at Freelandganj Railway Colony Dahod.
REDEVELOPMENT OF KATPADI JUNCTION RAILWAY STATION (BALANCE WORK) ON EPC MODE
Palakkad Division - Renewal of Glued Joints, SEJs and elimination of Fish plated joints in yards across division.
(1) Metallizing and transportation of RDSO standard RH girders from EWS/AJJ to various locations in Palakkad division & supply and fixing of Galvanized H beam sleepers & fittings (2) Construction of shed for storage of materials at Palakkad.
Shoranur junction - Construction of staff quarters in lieu of condemned and dismantled quarters Type II - 12 units & Type III - 4 units at Shoranur.
Shoranur-Mangalore section: Proposed construction of additional under pass (1 x 6.00 x 3.80 m RCC box) adjacent to exg. Br.no.1131 (RUB) at km 775/100-200 between Payangadi and kannapuram station ( deposit work of state govt- Kallayassery gramapanchayat).
Palakkad Division - Sr. Divisional Engineer/West/Palakkad Jurisdiction - Proposed renewal SEJ to TWSEJ and Glue Joints.
Provision of standard height gauge at various Level crossings in SSE/P.way/TJ, CUPJ, A-TVR, B-TVR, KMU, MV & B-VRI sections.
Operation and maintenance of sewage treatment plant /Ponmalai, watering and maintenance of Beema Bamboo garden at Elephant park at Ponmalai for a period of Eighteen months.
Provision of standard height gauge at various Level crossings in SSE/P.way/ALU, LLI, VM, TPJ, TNM & VLR sections.
(i) Resurfacing of Platforms and augmenting of amenities for Divyagjan at various stations in SSE/W/TVR section and (ii) Construction of switch room building at TVR Electrical substation.
Divisional Engineer/East/Palakkad section: Left over works in connection with : CTR (P) 23.293 Km (between PTJ-SRR, SRR-CLT) such as provision for ballasted track for a total length of 0.800 Km duly demolishing existing damaged CC apron at Rd No.4 of PGT yard ( Km 533.800-534.600 (on B line)) and RCC side drain for a length of 800 mtrs.
Central Workshops/Ponmalai- (i) Construction of Load Box Shed near East Gate and (ii) Complete Track Renewal (Secondary) for a length of 900m near Paint Shop and BRS.
Palakkad Division - Sr. Divisional Engineer/West/Palakkad - Supply, Installation and maintenance of auto chlorination plants at various stations of Senior Section Engineer/Works/Calicut, Senior Section Engineer/Works/Kannur and Senior Section Engineer/Works/Mangalore sections for a period of 2 Years.
Mangalore Junction - Improvements to the freight maintenance infrastructural facilities at Mangalore Junction.
MAS-GDR Section-Construction of new TRD depot at Sullurupeta (SPE) along with tower wagon shed with pit line and cat walk arrangements.
ADEN /Metro/ MAS's jurisdiction -Reconstruction of 2.25lakhs lit capacity RCC OHT in lieu of dismantling dilapidated Steel tanks in PWQ colony.
"1) MAS Division- Casual Renewal of Switches, Crossings, Rails, Plain track sleepers and P&C sleepers. 2) MAS-AJJ section- Conversion of FP track to LWR at ADEN/ Central subdivision. "
MS-VM Section- Construction of new TRD depot at ACK (Acharapakkam).
GPS SPEEDOMETER ALONGWITH ITS ATTACHMENTS
Supply of spares for maintenance of RO+UV Water Purifier (Brand AG GR Pure Chill 120 PSS RO+UV).
Nord Lock washer NL0 series DP* Carbon Steel suitable for Bolt Dia. M14
ETHINYL ESTRADIOL 0.03 MG AN
ENZALUTAMIDE 80 MG ORAL TAB/CA
DENOSUMAB 120 MG/ML INJECTION
SPEED SENSOR CABLE FOR WSP WITH CONNECTOR
Supply of Nitrogen Cylinder Capacity 50
Rubber Coated tarpaulin (SRF) Size 20'X18'
FLUVOXAMINE 50 MG TAB. (ITEM NO. 1668 OF AMI 2025-26)
CLOTRIMAZOLE 1% W/V LOTION 30 ML (ITEM NO. 1928 OF AMI 2025-26)
Nitrogen Cylinder Capacity 24L, 200 Ba
VESDA COMPACT LASER DETECTOR SANROK
GREASE SHELL ALVANIA
Supply, installation and commissioning of Driving/Idle planetary gear with complete assembly EOT Crane capacity 50/10 Ton suitable for Garlic
Supply, Installation and commissioning of cleaning arrangement for three phase locomotive radiator as per attached specifications.
Supply, Testing and commissioning of CCTV accessories.
Repairing of wagons during ROH of 2500 wagons at ROH Depot, Bokaro.
ROH of 1500 wagons at Wagon Depot/ NMP under PB item no.:469/2024-25
COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT FOR PM10 Analyzer system installed in Adra Division at Chandil under SSE/C&W/PRR and Bokaro under SSE/C&W/BKSC (Total- 03 Nos.) for three years.
Work of Wheel shunting (marshalling) in wheel shop in all sections (Assembly section, Repair section, Dedicated wheel shop, LHB wheel shop, Wheel shop yard and Roller bearing shop) at C&W workshop, N.Rly., Jagadhri Workshop for 12 months.
HEAD LIGHT ASSEMBLY. Cab end.EMD.Pt.No.8247096 & DLW Pt.No.18360683
Spare Parts for MOBILE HYDRAULIC PRESS MACHINE-70/100 TON
Ribbon Loop (12.7 mm X 10 meter) for CARTRIDGE
ANGULAR CONTACT SPRING COMPLETE [FIXED CONTACT] AS PER M/S.ABB DRG.NO.INA 516497 R2.