Loading…
Loading…
379 results • Recent activity
Laying of CC Roads from a. D.No.44/35-7-2 to 44/35-6-1, in Prakruti Nagar, b. D.No.96/185-2-181 to 96/185-2-20, in Ganapathi Nagar, Utukuru in Division No.45.
Construction of CC Drains from a. D.No.8/1461 to 8/1463-2 in Agadi, b. D.No.8/209-4-6 to 8/209-1-3, c. D.No.8/209-4-3 to 8/209-3-1, d. D.No.8/1094 to 8/1080, in Agadi Division No. 38
Laying of CC roads from D.No.50/251 to 50/274-10 & 51/204 to 51/206, in Ravindra Nagar, Division No.41.
Construction of CC Drain from D.No.1/2673 to 1/2654, in Housing Board Colony, Division No.19.
Laying of 11Omm Dia HDPE Pipelines from A. D.No.36/323-26-2 to 36/323-22-4, B. D.No.36/323-28 to 36/323-28-1-4 in Road Nos.5 & 6. C. D.No.36/323-4 to 36/323-7-1, in Road No.01, D. D.No.36/323-22-8-3 to 36/323-22-11, in Road No.9, E. D.No.36/323-25-2 to opp 36/323-26-1-8, in Road No.14 in Division No.12.
Laying of CC Roads from a. D.No.96/185-2-1 to 96/185-2-2, b. D.No.96/179-2-11 to 96/185-2-12, c. D.No.96/185-2-23 to 96/185-2-20 in Ganapati Nagar, Utukuru, Division No.45.