Loading…
Loading…
3,299 results • Latest
Laying of CC Road in 14th ward area in Shankarpaly Municipality. Under Municipal General Funds.
Laying of Strom water Drain in 6th ward area in Shankarpally Municipality. Under Municipal General Funds.
Supply and Errection of 9 Mtrs 3Nos Mini Himast poles at Junction in Div No.26 of MCK Est. cost of Rs. 2.16 Lakhs under MGF
Balance work of Rajeev park i.e, Gravel filling, EPDM (Ethylene Propylene Diene Monomer) Flooring, Children play items, hiring the Vehicles for bushes clearance, Engaging the Man Mazdoor for miscallaneous works etc at Rajeev Park located in Sangareddy Municipality
Laying Of R.C.C Drain Slab Culvert And CC Road From Sai Teja Sri Residency (Apartment) To Hanuman Temple (Beside Water Tank) And Valve Homes To Kisan Nagar Smart City Road (Open Gyam) At Vidyaranya Puri Road No.3 In Division No 28 Of Municipal Corporation Karimnagar Est. cost of Rs. 50.00 Lakhs under UIDF 2024-25
Providing MS Gate and CC ramp to the IVNMC Market at Beetbazar in Jagtial Municipality under Municipal General Fund
Laying of CC road for Peddamma Temple Ground Surroundings at Hanuman nagar, Arepalli in Div No.1 of MCK Est. cost of Rs. 12.80 Lakhs under MGF
L/o of CC Road and C/o UGD from H.No.5-5-88/1 to H.No.5-4-65 in Division no.55 of Karimnagar Est. cost of Rs. 13.60 Lakhs under SUDA
Construction Of C.C. Drain And C.C Road From H.No.5-67/8/2/3 (Boopathi Anji) To Existing Drain At Durshed in D.No.4 Of Mck Est. cost of Rs. 32.70 Lakhs under UIDF 2024-25 (recall)
Construction of CC Drain, Slab Culverts and Rcc and Swg Drainage pipe lines, CC Roads From H.no 5-72/8A/2 TO H.NO 11-3/C/A TO 11-3/C and H.NO.8-50 to 8-50/2 and Ramalayam Temple to H.no 8-47 at Bommakal in Div 6 Est. cost of Rs. 19.20 Lakhs under UIDF 2024-25 (Recall)
Construction Of C.C. Drain From Pathem Kanakaiah (H) To Govt School And Thumma Surendar (H) To V. Rajaiah (H) And Beeraiah (H) Kasu Rajaiah (H) And C.C Road From H.No.2-95/15 Erra Radha-Ram Reddy (H) And To Chigurla Komraiah At Kurmawada At Gopal Poor In D.No.4 Est. cost of Rs. 28.50 Lakhs under UIDF 2024-25 (Recall) (Reserved for ST Societies/Individuals)
Laying of C.C Road from H.no 7-2-840 to 7-3-175/2 Gopal Rao building back side at Masid road and Laying of C.C. Road from H.no 7-2-877 to 7-3-145 and H.no 7-3-170/B to 7-3-170/A and 110 mm dia HDPE water pipe line from H.no 7-3-170/B to 7-3-170/A Gopal Rao building back side at Masid road, Laying of 300 mm dia RCC pipe drain from H.no 7-2-810 to 7-2-813/A beside Osmani Building lane, Laying of 300 mm dia RCC pipe drain from H.no 7-3-83 to 7-3-62/1 Sri Chaithanay jr.collage road, Laying of C.C. Road and 300 mm dia RCC pipe drain from H.no 7-2-828 to 7-3-134/1 and Construction of RCC slab Culvert and CC road from Opp: Sri Chaithanya Jr.Collage at Mankamma thota in division no 61 of Municpal Corporation Karimnagar Est. cost of Rs. 50.00 Lakhs under UIDF 2024-25 (recall)
Construction Of C.C. Drain From Durgam Kanakaiah (H) To Bijjili Rajaiah (H) And Z.P Govt School To Ali Gopula Raja Mouli H.No.1-64/14 To 1-64/15 And Epno: Dsd/124/A To Epno: Gpd/137 At Shivalayam And And C.C. Road From Beside Akash Kiranam And Bejjenki Sampath And Nethi Ramaswamy (H) S.C. Colony At Durshed In D.No.4 Of Mck Est. cost of Rs. 40.80 Lakhs under UIDF 2024-25 (Recall)
Construction of CC Drain and CC Road at H.No 8-2-364 to 8-2-342/2, Cristal Appartment to 8-3-127 to 8-3-90/1 of Div No. 41 of MCK Est. cost of Rs. 50.00 Lakhs under UIDF 2024-25 (Recall0
Laying of C.C. Road and 300 mm dia RCC pipe drain from H.no 7-1-352 to 7-1-333 at Akula Shailaja Hospital lane and Laying of CC road and RCC drain pipe from H.No.7-1-130 to 7-1-242 in Division no 62 of MCK Est. cost of Rs. 98.00 Lakhs under UIDF 2024-25 (Recall)
Laying Of CC Road And Cc Drain From Shivadurga Nilyam And 10-96/10/A/3B To 10-96/10/A/1 At Rajeshwara Colony Road No 02 In Division 05 Est. cost of Rs. 23.00 Lakhs under UIDF 2024-25 (Recall) (Reserved for SC Societies/Individuals)
Laying of RCC Drinage Pipe line and C C Road From H NO 8-1-51/4 to 8-1-49/A ,8-1-34 TO 8-4-713/1, 8-4-583 TO 8-4-522/C , 8-4-612/1 TO 8-4-615/1, 8-4-612/C TO 8-4-635/1 , 8-4-668/A OPP, TO 8-6-665/4, 8-7-267/2 TO 8-7-288/A, 8-7-289/B TO 8-7-284/A/32 , 8-7-327/5 TO 8-7-324/2(OPP) AND Littile feet school AT Thirumala nagar and Hanuman nagar in div no 40 Est. cost of Rs. 50.00 Lakhs under UIDF 2024-25 (recall)
Construction Of Rcc Drain And Slab 6-6-901/A To 6-6-874 And 6-6-945/A(Opp) And S.W.G Drain Pipe Line And C.C Patch From H.No. 6-6-667/A And 6-6-664 To Main Road And Cc Road From H.No 6-4-140 To 10-5-200/1/A/1 In Division 27 Of Municipal Corporation Karimnagar Est. cost of Rs. 40.00 Lakhs under UIDF 2024-25 (Recall) (Reserved for SC Societies/Individuals)
Construction of CC Drain, Slab Culverts and Rcc and Swg Draingae pipe lines, CC Roads From H.no 1-73 and H.no 6-81/C to H.no 6-81/A/1 To Ambedkar Statue at Guntur palli and Bommakal In Division no 6 of Municipal Corporation Karimnagar and Est. cost of Rs. 38.60 Lakhs under UIDF 2024-25 (Recall)
Laying of CC road from H.No.2-9-72 to SR Junior college and drain from college to H.No.8-2-76 Dr. Naidu Hospital Main road Opp. Park gate and from college to H.No.2-7-44 near My Home mess at Mukrampura locality in Division No.64 of Municipal Corporation Karimnagar Est. cost of Rs. 50.00 Lakhs under UIDF 2024-25 (Recall)
Laying of CC Drain and CC Road From H NO 1-5-446 to 1-5-455 and 1-5-333 to 1-5-307 and 1-5-320 to 1-5-284 At Padmashali veedi and Laxmi Nagar in div no 56 of Municipal corporation Karimnagar Est. cost of Rs. 50.00 Lakhs under UIDF 2024-25 (Recall)
Construction of CC drain and RCC and SWG drainage pipe line and cc road from H.no 3-5-54 to H.no 3-4-245 and 3-5-78 to Ajantha Hair Style Shop in Division No 65 ,of Municipal Corporation Karimnagar Est. cost of Rs. 40.00 lakhs under UIDF 2024-25 (Recall)
Procurement of Tree Guards, supporting sticks for plants, engaging labour for planting and engaging of pitting machine for pits for Vanamahothsavam Porgramme 2026 under Green Budget Funds.
Laying Of C.C. Road From H.No.13-4-69/52/15/2/A/ To Existing C.C. Road At Vidyaranya Puri Road No.1 In D.No.3 Of Municipal Corporation Karimnagar Est. cost of Rs. 20.00 Lakhs under UIDF 2024-25
Laying Of C.C Road and C.C. Drain From H.No.6-2-754 To Health Center At Husaini Pura In D.No.33 Of Municipal Corporation, Karimnagar Est. cost of Rs. 40.00 Lakhs under UIDF 2024-25 (Recall)
Laying of RCC SWG Pipe Drain in 1st Ward Balaji Super Markert to Bhanuri Vittalaiah House Near Raos School T Gopal House to Indrajith House MV Ramana House to Jangampet Madhava Reddy House and Marri Venkat Reddy House to Pathepur Laxma Reddy House various loactions in Shankarpally Municipality. Under Municipal General Funds.
Laying of RCC SWG Pipe Drain in 3rd Ward Baddam Kanth Reddy House Galli, BNR Back Side Road, 13th ward Murukula Venkatesh House to Telugu Laxmi House, 14th Ward Sale Venkatesh House to Rajaram House and 10th ward Beerla Beeresh House to Church of various loactions in Shankarpally Municipality. Under Municipal General Funds.
Hiring of Hitachi for lifting of garbage and providing access to sanitation vehicles at Dumping Yard in Shankarpally Municipality. Under Municipal General Fund. Recall.
Laying of Under Ground Drainage in 9th Ward Deva Gopal House to Pochamma Temple in Shankarpally Municipality. Under Municipal General Funds. Recall.
Laying of CC road from H.No.11-2-100067 to 11-2-107/9/2/2 and 11-2-111/1 to 11-2-126 at Sai balajinagar, seethrampur in Div no.21 (old) of mck Est. cost of Rs. 36.00 Lakhs under MGF
Laying of RCC pipeline and CC road from Chindam Kanakaiah House to Nampally Anil Kumar at Alugunur in Div No.8 of MCK Est. cost of Rs. 15.20 Lakhs under MGF
Construction of CC drain from Siricilla Srinivas House to R and B Culvert and H.No.5-100/47/A/1 to warangal road at Bhavaninagar at Alugunur in Div No.8 of MCK Est. cost of Rs. 19.40 Lakhs under MGF
Construction Of UGD/Repairs to UGD Line/Laying of CC Road in Ward no.08 in Indresham Municipality under MGF 2026-27/Any other Grants.
Temporary arrangement of lighting and sound system on hire basis at Arepally, Seetharampur, Theegalaguttapalli, Vallampad, Kothapally,Rekurthi during festival of Bathukamma of MCK-2026 Est. cost of Rs. 13.40 lakhs under MGF
Construction of RCC slab culvert and drain from existing CC drain to H.No.13-1-96/A/1 at Kodanda Ramalayam in Div No.2 of MCK Est. cost of Rs. 13.20 Lakhs under MGF
Laying of CC road From H.no 6-5-408 to H.no 6-5-317/B/1 and H.NO 4-6-65 TO H.NO 5-1-4 (Rural police Station Road) and H.no.4-3-19 TO Lavanya Tiffen Center and H.no 4-5-377/A near Netha Bazar in Division no 66 of Municipal Corporation Karimnagar Est. cost of Rs. 50.00 Lakhs under UIDF 2024-25 (Recall)
Prevention of Water Pollution in Gollachervu by Construction of Sullage CC Drain from Raghavendra Temple to Eidgha, Chengeshpur Road in Tandur Municipality under UIDF
Construction of Storm water Drains in Various places of Kothakota Municipality under Nagarabhivrudhi Grants
Laying Of CC Road From H.No 6-3-7/4 To (Opp) 6-3-5/1/A/1 in Division No.31 Of Municipal Corporation Karimnagar Est. cost of Rs. 10.00 Lakhs under MgF (Reserved for SC Societies/Individuals)
Laying Of Swg Drainage Pipe Lines And Cc Patch From H.No 6-6-1008 To 6-6-1012/1 In Division No 27 Of Municipal Corporation Karimnagar Est. cost of Rs. 10.00 Lakhs under MGF
Hiring of motor car to municipal Chairperson Gaddapotharam in Gaddapotharam Municipality Under Municipal funds iteam 38
Supply and Delivery of Ferric Alum for the maintenance of water supply at MBR and pedda cheruvu Filter beds in kamareddy municipality under General Fund
Construction of CC drain and RCC drainage pipeline exist drain to Raw sewage wet well cum pump house in STP premises in Div No.7 of MCK Est. cost of Rs. 4.70 Lakhs under MGF
Laying of SWG 200mm dia drain pipe line and laying of CC road from H.No.3-3-174/2 to thirupathi reddy Hospital and H.No.3-3-179/A to Bharathi Nilayam at Sawaran street in Div No.52 of MCK Est. cost of Rs. 4.99 Lakhs under MGF
Laying of 110mm dia HDPE pipeline from H.No.15-11-94 to existing road, 11-89 to 11-91 and 15-11-83 to 11-82/A/1 to Bedu Budigajangala Colony nagar and 11-81 to 11-11-1/25 budigajangala colony road no.9 in Div No.20 of MCK Est. cost of Rs. 6.30 Lakhs under 15th FC
Laying of RCC NP3 300mm dia drain pipeline from Telangana minorities residential Girls-1 school to H.No.4-56/11 (near sairam Kiranam and General store) at rekurthi in div no.19 of MCK Est. cost of Rs. 2.60 Lakhs under MGF
Repairing of damaged RCC Slab culvert from Padmavathi Kalyana Mandapam, Telangana Grameena Bank, Mankamma thota Opp Venkateswarlu temple of MCK Est. cost of Rs. 2.20 Lakhs under MGF
Supply and Annual Maintenance of National Flag of Size 32 Ft X 48 Ft for a period of 12 months at Multipurpose School of MCK Est. cost of Rs. 4.90 Lakhs under MGF
Removal of wet silt and sludge from the existing drain from near Dhobi Ghat to SBS Function Hall to Sai krishna theater of MCK Est. cost of Rs. 1.85 Lakhs under MGF (Reserved for SC Societies/Individuals)(Recall)
Errection of High mast light near infront of markandeya temple in 7th ward at kothapalli municipality Est. cost of Rs. 1.00 Lakhs under MGF (3rd Recall)