Loading…
Loading…
1,236 results • Recent activity
TRIPLE DECK VIBRO SIEVE 24 INCH, SS 22 MESH WITH 24 DIADIA, SS 24 MESH WITH 24 INCH, SS 25 MESH WITH 24 INCH, SS 26 MESH WITH 24 INCH, SS 32 MESH WITH 24 INCH, SS 35 MESH WITH 24 INCH, SS 36 MESH WITH 24 INCH, SS 38 MESH WITH 24 INCH, SS 40 MESH WITH 24 INCH, SS 60 MESH WITH 24 INCH
Modular Table/Meeting Table/Centre Table (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7138865 Dated : 23-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 16 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/8 Beneficiary : CHIEF GENERAL MANAGER Munitions India Limited, Central, Department of Defence Production, Ministry of Defence (Munitions India Limited, Ordnance Factory Itarsi)
Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Cable Joint Kit Suitable for Cables Up to and Including 33 kV (V2) (Q3), Cable Termination Kit Suitable for Cables Up to and Including 33 kV (V2) (Q3)
DESIGN, MANUFACTURE, SUPPLY, TESTING AND COMMISSIONING OF BATTERY OPERATED PLATFORM TRUCK (BOT), 4 W
Dobeckot E-4 Resin