Loading…
Loading…
1,453 results • Recent activity
MAGNESIUM CARBONATE, HEAVY TO SPECN: -JSS-6810-83- 2017 (REV. NO. 5) .
MS PIPELINE FOR TRANSFER OF OLEUM & SULPHURIC ACID
SQUARE SHOULDER SLOT MILLING CUTTER DIA 20 MM HAVING WELDON TYPE, SHANK DIAMETER 20 MM, TOTAL LENGTH, INSERTS FOR SQUARE SHOULDER SLOT MILLING CUTTER HAVING INSERT CUTTING LENGTH 10 MM MINIMUM, INSERT C, TOOL HOLDER PDJNL 2525 M15., TOOL HOLDER PDJNR 2525 M15-BOMB BODY 81., INSERT DNMG 150608- PVD COATED CARBIDE, RANGE ISO GRADE: S05- S15, HIGH POSITIVE RACK AND POSITIVE RAD, INSERT DNMG 150604 POSITIVE RAKE, CVD/PVD COATING STAINLESS STEEL GRADE., INSERT CCMT 060204- CVD/PVD COATED CARBIDE, FOR INTERRUPT & UNINTERRUPT MACHINING, APPLICATION RANGE, BORING BAR SO8K-SCLCL 06.
TOOL HOLDER PDJNL 3225 P15., INSERT DNMG 150616- CVD/PVD COATED CARBIDE, FOR INTERRUPT & UNINTERRUPT MACHINING. APPLICATION RANGE
Industrial Platform Truck (Q2) (3 (3 ))
Vertical Autoclave (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7073187 Dated : 05-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 40 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/8 Beneficiary : Munitions India Limited, Ordnance Factory Itarsi Ordnance Factory Itarsi, Munitions India Limited, Ministry of Defence, Distt- Narmdapuram, 461122 (Munitions India Limited, ordnance Factory Itarsi)