Loading
Loading…
Loading…
33 results • Recent activity
Construction of RCC drain from the cemetery to Devendra Goswami plot in Ward No 01
Ward No 02 Construction of RCC drain from Vashira plot to Khar (length-30 meters)
Ward No 02 Construction of RCC drain from Shabu house to Raju Malik house (length-30 meters)
Ward No 02 Construction of RCC drain from Mushahid house to Lallu Khan plot (length-30 meters)
Ward No 02 Construction of RCC drain from Altak plot to Veer Singh fields (length-30 meters)
Ward No 01 Construction of RCC drain from Murari field to Mahavir field 30 meters