Loading
Loading…
Loading…
2 results • Latest
SWI-Reconditioning of Pit line no.2 & 3 at NED (drainage, water pipeline, and improvement lighting and stores). SWII- Extension of Lalwadi Pit line-1 by 3 coached and (24 coaches) along with balance work of one side catwalk for 3 coach length etc. SWIII- Construction of first floor of TLAC side building at coaching depot Nanded.
Provision of Ballast less Track at Nanded station. (Trail of new design of BLT-IFS for speed up to 130kmph- Road2-720m).