Loading…
Loading…
140 results • Recent activity
Sound Level Meter/Noise Level Meter (Sound Measuring Apparatus or Decibel Meter) (Q3) (3 (3 ))
Customized AMC/CMC for Pre-owned Products - Non Comprehensive Annual Maintenance Contract of Three 03 Air Cooled Chillers Bluestar Make and Model LCA1 105X55H Equipment Serial Nos GSI00013 GSI00014 and GSI00015 Capacity 105 TR Each; Blue Star Limite..
Custom Bid for Services - Hiring Of Event Per Visit Based HVACACs AMC Services At NATRAX Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system Annual Maintenance service-AIR CONDITIONER
LED Luminaire (Recessed Luminaire) (V3) Conforming to IS 10322 (Part 5/Section 2) (Q3), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3), LED Luminaire for High Bay Lighting (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ?? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6622265 Dated : 29-08-2025 Bid Document 1/16, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Primary product category LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 950000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Calibration Services - Calibration of Horiba Make Solid Particle Counting System (SPCS); calibration, inspection, and performance verification of the Horiba SPCS (Solid Particle Counting System); OEM (Horiba Japan) or his authorized channel partner; ..
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3)