Loading…
Loading…
245 results • Latest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Service Charges for increasing the foundation height of SS Tank at ICAT Centre 1 Manesar Haryana; Buyer
Dosingpump (Q3)
Thermocouple Standards Platinum/Platinum Rhodium (Q3)
Filter Drier Core DC48 (Make: Danfoss)
High Voltage Differential Probe Make Pintek
SITC & Training of Dual Station Rolling Resistance Test Machine
Wet Grip Trailers for C1 & C2 Tyres Testing in Vehicle Evaluation Lab
Hiring of Consultancy Services - Percentage based - Appointment of Designated Executing Agency (DEA) for Civil and MEP Works at ICAT Centre - 2, Manesar; DPR, RFP Preparation & Bid Process Management, Project Management; Yes; Hybrid(As specified in sc..
Operation and Maintenance Of Electrical Systems/Electrical Installations - Supply and Laying of LT cable to porta cabins at SP and HST of VEL GARC Chennai
Old Dhoti, Hand Glaves, Mask, PVC Clamp 25mm, PVC Clamp 20mm, 6mm Hammer Drill Bit, 8mm Hammer Drill Bit, 10mm Hammer Drill Bit, 12mm Hammer Drill Bit, 14mm Hammer Drill Bit, 16mm Hammer Drill Bit, 20mm Hammer Drill Bit, 25mm Hammer Drill Bit, Normal Jobber Drill Set 1.5mm to 13mm, 6mm PVC giti, 8mm PVC giti, 12.5mm Jipsam self Screw, 20mm Jipsam self Screw, 25mm Jipsam self Screw, 32mm Jipsam self Screw, 20mm Wooden screw, PU Foam, M-Seal, 1 inch Clamp Nut and Bolt, 20mm Clamp, 32mm Clamp, 20mm PVC Flexible Pipe, 25mm PVC Flexible Pipe, 8X12.5mm PU pipe connector, 6X12.5mm PU pipe connector, 10X12.5mm PU pipe connector, 8X3-8mm PU pipe connector, 10 X3-8mm PU pipe connector, 12X12.5mm PU pipe connector, 14X12.5mm PU pipe connector, 6X4mm PU pipe reducer, 8X6mm PU pipe reducer, 10X8mm PU pipe reducer, 12X10mm PU pipe reducer, 12X14mm PU pipe reducer, 6X6mm PU pipe reducer, 8X6mm PU pipe connector, 10X10mm PU pipe connector, 12X12mm PU pipe connector, 25mm CPVC Pipe, 20mm CPVC Pipe, 25mm CPVC Socket, 25mm CPVC Elow, 25mm CPVC Valve, 25X20mm CPVC Reducer, 25X20mm CPVC Bush, 25mm Union, 20mm CPVC Socket, 20mm CPVC Elbo, 20mm CPVC Union, CPVC Solvent 250gm Dibbi, 20mm CPVC Valve, 20mm CPVC FTA, 20mm CPVC MTA, 25mm CPVC FTA, 25mm CPVC MTA, 20mm UPVC Pipe, 20mm UPVC Socket, 20mm Elbo, 20mm UPVC FTA, 20mm UPVC MTA, 20mm UPVC UNION, 20mm UPVC VALVE, 25mm UPVC Pipe, 25mm UPVC Socket, 25mm UPVC Elbow, 25mm UPVC Union, 25mm UPVC MTA, 25mm UPVC FTA, UPVC Solvent 250gm Dibbi, 32mm PVC clamp, 80mm water meters, 80mm Butterfly valve, 80mm NRV, 50mm Butterfly Valve, 50mm NRV, 65mm Butterfly Valve, 65mm NRV, 80mm Flanch, 65mm Flanch, 50mm Flanch, 20mm Brash Ball Valve, 25mm Brash Ball Valve, 32mm Brash Ball Valve, 12.5mmX20mm GI Reducer-Bush, 20mmX25mm GI Reducer-Bush, 25mmX32mm GI Reducer- Bush, Rubber Gaskits, Champion Asbertus Gaskit, 25mm UPVC Tee, 20mm UPVC Tee, 25mm CPVC Tee, 20mm CPVC Tee, 25mm Water Tank Float Valve with Ball, 20mm Water Tank Float Valve with Ball
SPC Filter Puck Screen 47mm, SPC Filter Puck Screen 70mm
Rim Tubeless MT 2.15, Rim Tubeless 4.50J, Rim Tubeless 5.50J, Rim Tubeless 7.00J, Rim Tubeless 7.50J, Rim Tubeless 10.50J, Rim Tubeless 8.00J, Rim Tubeless 9.50J, Rim Tubeless 8.50J, Rim Tubeless 9.00J, Rim Tubeless 10.00J, Rim Tubeless 7.50, Rim Tubeless 8.25, Rim Tube Tyre 7.50J
Sound Level Meter/Noise Level Meter (Sound Measuring Apparatus or Decibel Meter) (Q3) (3 (3 ))
Heavy Duty Storage Racks (Q3)
Supply of Tool with Trolley
Particulate Matter (PM) Filter, 47 MM
Operation And Maintenance Of Other Machines And Plants - Procurement of AVL CAHU EEU Drive and installation in PWT -ETC Lab at GARC
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable water purification system with inbuilt water cooler.; 1 Year; PACKAGE-4 : Water purifier and conditioning system maintenance involving basic servicing, f..
Operation And Maintenance Of Other Machines And Plants - Procurement of Accelerometers and its cables for ED shaker at FAT Lab, GARC
Voltage Transformer - Dual purpose - Indoor (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7126883 Dated : 19-01-2026 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Primary product category Voltage Transformer - Dual purpose - Indoor Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 55460 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Flameproof LED Emergency Light (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7116434 Dated : 15-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 119180 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Contactor Make- SCHNEIDER ELECTRIC, Puls Power Supply CP20.241 10A Make- PULS, Puls Power Supply CP20.240 20A Make- PULS, Multifunctional Safety Timer Make-Dold
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Automotive Testing Centre; Electrical System or Installation; Service Provider
Customized AMC/CMC for Pre-owned Products - AMC Service for Air Compressors (Make Atlas Copco) Model ZT75 Serial Numbers PNA532070 and PNA532071(PAC); AMC Service for Air Compressors (Make Atlas Copco) Model ZT75 Serial Numbers PNA532070 and PNA53207..
Direct Evaporative Air Cooler (V2) ISI Marked To IS 3315 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7160756 Dated : 28-01-2026 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 131170 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Monoblock Centrifugal Pump Make-Wilo Model-Wrox-406, Monoblock Centrifugal Pump Make-Wilo Model-MPM-0716, Monoblock Centrifugal Pump Make-Willow Model-MPM-1019
KIT FUEL FILTER AND RING, SEAL O RING, ELEMENT LUB OIL FILTER, INHIBITOR, CORROSION 205 LTRS, VALVOLINE PREMIUM BLUE 7800 PLUS, KIT SUPER BYP FILTER ELEM, ELEMENT CRN RESISTOR, COOLANT EG 5050 PREMIXED 50 LT DRUM
Supply of Pre-Amplifier of frequency range (10 kHz– 1 GHz), Supply of Pre-Amplifier of frequency range (1 GHz- 18 GHz)
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - Earth Pit Resistance Value; Resistance Value; Any other Government Approved Labs Service Providers, Any Other Government Approved Lab/Service Providers Class-A Licen..
Refilling of Fire Extinguisher Cylinders - Water Based Fire Extinguisher, Dry Powder Fire Extinguisher, Foam Based Fire Extinguisher, Carbon Dioxide Fire Extinguisher and Water Mist Type Fire Extinguisher; 10 Kg; 4 Years to 5 Years
Bus Hiring Service - Short Term - Local; 22-24; Non Deluxe (NDX), Semi Deluxe (SDX); 180
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Automotive Test Agency; Upgradation of existing Horiba PEMS for RDE Test Facility under PAC Bidding; Service Provider
ARC for Supply of Calibration and Operational Gases used for
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Non-Comprehensive AMC for 2X 1250 kVA Perkins DG for FY-2026-27; Non- Comprehensive AMC for 2X 1250 kVA Perkins DG for FY-2026- 27; Buyer
Supply of Push Pull Gauge
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2)
Kit B Maintenance Product No 2230011309 Make Atlas Copco, Roto Z oil 20L Product No 2908850101 Make Atlas Copco, Hose Assembly Product No 1621057700 Make Atlas Copco, EWD Drain kit Product No 2901063320 Make Atlas Copco, High temp grease 400gms Product No 2901033803 Make Atlas Copco
Procurement of ABB Make Drive Spare Parts
SOLENOID VALVE P No 3100188912, PUMP ASSY P No 3200641461, PCB, P No 3014060959, HEATER, P No 3011028418, PRINTED BOARD COMB P No 3200169703, PRINTED BOARD UNIT P No 3200164129, PRINTED BOARD UNIT P No 3200087012, TUBING PUMP P No 3200082895, FILTER ELEMENT P No 3200082497, CAPILLARY P No 3014060523, F PACKING P No 3200082641, O RING P No 3011017423, Kvaser Leaf Light P No 4000058367, LIGHT SOURCE UNIT P No 3200828937, STEPPING MOTOR P No 3030021022
Calibration Services - Mechanical; Mass and Volume, Force; NABL Labs; Hybrid (detailed in scope of work)
Supply and Installation of LED Floodlight 150 watts system with AC-DC Driver for VSAC
Pressure Calibrator (Q3)
Seat Pad Accelerometer, Wire Rope Pots, Single axial accelerometer, Tri-axial accelerometer, LVDT 200mm, LVDT 300mm, Linear Strain Gauge to measure strain in know direction, Rosett Strain Gauges, Strain gauges installation kit, Protection Coating, Toughbook
Digital Data Logger (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7150942 Dated : 25-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 103937 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Hiring of Consultants - Milestone/Deliverable Based - Environmental Testing and Certification as per the Environmental Protection Act 1986; Environmental Testing and Certification as per the Environmental Protection Act 1986; Yes; Onsite
Calibration Services - Mechanical; Pressure and Vacuum, Speed & Acceleration; NABL Labs, CSIR Labs; Hybrid (detailed in scope of work)
Operation And Maintenance Of Other Machines And Plants - PWT Bus duct servicing and Re-insulation and installation and commissioning activity at PWT Lab, GARC
Operation And Maintenance Of Other Machines And Plants - Procurement of Harmonics & Flicker Generator at EMI/EMC Lab, GARC
humidifier Bottle PAC
Customized AMC/CMC for Pre-owned Products - Annual Maintenance Contract for Weatherometer machine; Annual Maintenance Contract for Weatherometer machine; Annual Maintenance Contract (AMC); On a half yearly basis; Yes