Loading…
Loading…
1,695 results • Recent activity
LOADSTER MINIATURE CIRCUIT BREAKER SINGLE POLE 003, LOADSTER MINIATURE CIRCUIT BREAKER SINGLE POLE 009, LOADSTER MINIATURE CIRCUIT BREAKER SINGLE POLE 0029, LOADSTER MINIATURE CIRCUIT BREAKER SINGLE POLE 0056, LOADSTER MINIATURE CIRCUIT BREAKER SINGLE POLE 0058
Custom Bid for Services - Contract for Reconditioning of safety valve gate valve glove valve ball valve and NRV of Line I and Line II Plant during Annual Turn Around for the year 2026-28 at NFL Vijaipur Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Magnetic Particle Tester, Portable Magnetic Yoke, UV-A Led Torch, Digital Gauss Meter, Pie Gauge, Lifting block of 4.5 kg, Lifting block of 18.1 Kg, White Contract Paint - Aerosol Can -420ml, Black Magnetic Ink-Aerosol Can - 420ml, Fluorescent Magnetic Ink-Aerosol Can -420ml
Portland Pozzolana Cement (Fly Ash Based) (V3) Conforming to IS 1489 (Part 1) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7041900 Dated : 24-12-2025 Bid Document 1/7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
stanvac Rust Remover Solution, Size 400 ml in Aersol
SHAFT EARTHING BRUSH