Loading…
Loading…
91 results • Recent activity
SLOPE STABILIZATION WORKS FROM KM CH. 106.400 TO KM CH. 106.460 WITHIN JARWA I RESERVE FOREST OF NH 04 IN THE UT OF ANDAMAN AND NICOBAR ISLANDS ON ITEMS RATE BASIS IN THE FY 2025 26.
Construction of left-over work (2-lane with PS) of the road stretch of Pkg-III at Kandni Village from design Ch. 0.000 to Ch. 4.037 (Ch. 70.900 to Ch. 74.650 of NH-244) in 4.037 km length on Khellani-Chhatroo section of NH-244 in UT of JK on EPC Mode
Construction of Intermediate Lane of Pango to Jorging Road from Design Km 40.000 to Design Km 82.060 section of frontier Highway NH913 Design Length 42.06 Km, Pkg_II, Greenfield Alignment
One Time Improvement under Rehabilitation work of the Existing Road stretch from Demwe Km 718.840 to Brahmakund Km 742.400 Section of NH 13 Total Length 23.560 Km in the State of Arunachal Pradesh on EPC Mode
One time improvement of Chandipur-Kanchanpur road of NH-44A from Km 75.500 to Km 86.000 in the state of Tripura in the FY 2025-26 on item rate basis work order basis (Balance Work).
Performance based Maintenance Contracts PBMC work of National Highway 10 Ch. 0.000 to 26.000 from Coronation bridge and 29th mile in India in the state of West Bengal in FY 2025 26