Loading…
Loading…
91 results • Recent activity
Slope stabilization and protection works at CH Km 25.8 near Likhuveer of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal
Short term maintenance Contract at selected locations between Km 0.00 to km 65.00 of Pailapool - Hangrum in the State of Assam during the year 2025-2026
Performance based Maintenance Contract PBMC work for the Rhenock Rorathang Pakyong section of National Highway 717A Ch 0 000 to Ch 26 706 in the state of Sikkim
Balance work for rectification of damages caused to bituminous pavement and road side drain for laying of PHED pipelines in connection with the project work of Ravangla Tunnel PKG-III (Design Chainage from KM 32.500 to Km 33.600) of NH-510
Hill Side Slope protection work at Kameda in the work of Construction Upgradation of existing road to 2lane with paved shoulder from Km 368 to Km 399 of Lameri to Karanprayag of NH07 in the state of Uttarakhand
Repair and Maintenance of the road stretch from Km 521.00 to Km 550.15 from Oyan to Pasighat, NH-515 (Total length 29.15 Km) (Pkg-II and III) in the State of Arunachal Pradesh