Loading…
Loading…
56 results • Recent activity
PBMC works at section NH-513 from Km 91.94 to Km 117.22
Short Term Maintenance Contract (STMC) for the year 2025-26 to NH-715A (From km 93.13 to km 134.75) (Total Length 41.62 Km) and NH-15 (km 17th, 27th (400m), 81st) (Total Length 2.4 km) under PWD, Rangia NH Division, Rangia in the state of Assam.
Maintenance works through STMC on NH-17 and NH-427, under PWD, Guwahati NH Division in the state of Assam under Annual Plan 2025-26.
Maintenance works through STMC for the year 2025-26 from Km 25/000 to Km 54/000 (Daloitola to Doulasal section) on NH-427 (Total length 29 Km.) under PWD, Guwahati NH Division in the state of Assam under Annual Plan 2025-26.
Short Term Maintenance to NH-17(New) / NH-31(old) (Total length of the project 49.000 km) under Abhayapuri Construction Division, Abhayapuri in the state of Assam.
Strengthening of existing pavement