Loading…
Loading…
25 results • Latest
LED Inflatable Tower lights technical specification as per annexure A attached
Set of tools and equipment Required for Road ART/Brake Down Amla (details as per annexure). Test certificate should be from NABL approved lab only.
Transformer Oil Filtration Plant 3000 LPH, Detailed Technical Specification attached.
CCTV Surveillance System Installation -Complete installation including:, Mounting of cameras, Cable routing and management, Configuration of NVR and cameras, Testing: camera focus, NVR recording, live feed check
FIBRE GLASS INSULATING FIRE RETARDENT SHEET OF 10 MM THICKNESS AS PER ISO: 10192-1982, Dielectric strenth -25KV/mm with glass content 25 to 34% in standard size of 1.10x1.10 Mtr as per spec. No.IS:10192-1982
Supply, Installation & Commissioning of CCTV Cameras at 03 locations i.e., Divisional Stores Depot, Santra Market, Nagpur, Divisional Scrap Depot, Ajni and ELS Depot Ajni to be operated individually at all locations as per attached Scope of work.