Loading…
Loading…
369 results • Latest
Maintenance of Hathikali to Narimbangalo section of NH 54E from Km 83.400 to Km 140.700 (new NH-27) in the state of Assam at the Risk and Cost of the PBMC Contractor , on item rate(percentage) basis.
One time improvement of 2 nos of Bypasses of Four Laning of Palma Gumla Section of NH23 i e Bero Bypass Length 3.500 km and Sisai Bypass Length 8.000 Km Total Length 11.500 Km in the state of Jharkhand on item rate Percentage basis
Maintenance of Lanka-Hathikali section of NH-54E (New NH-27) from Km 22.000 to Km 83.400 in the State of Assam at the Risk and Cost of the PBMC Contractor , on item rate(percentage) basis.
Overlay at various stretches of 6-lane access-controlled Greenfield Highway from km 67.000 to km 99.000 of Rajasthan Gujarat Border to Santalpur section of NH-754A in Gujarat on EPC mode at Risk and Cost of existing Contractor
EMPANELMENT OF ADVERTISING AGENCIES FOR REGIONAL OFFICE, NHAI, NAGPUR
CONSTRUCTION OF 4 LANE THIRUVANANTHAPURAM OUTER RING ROAD (ORR) FROM NAVAIKULAM (CH. 0.000) TO VIZHINJAM (CH. 62.700) SECTION OF NH 866 DESIGN LENGTH 62.7 KM IN KERALA ON BOT MODE