Loading…
Loading…
353 results • Latest
Construction of 6 Lane Grade Separator Structures 03 Nos with Approaches and Service Roads, including AD Lane, at Km 218.200 Sindhauli Junction, Km 233.500 Radha Krishna Mandir, and Km 237.400 Jhumka Tiraha, on NH-530 Moradabad Bareilly Section in UP
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 0.000 (Tansen Chowk Purani Chhawani Gwalior) to Km 77.000 (Near Village Prithvipur) of NH719 in Madhya Pradesh on Hybrid Annuity Mode (Package1).
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 77.000 (Near Village Prithvipur) to Km 116.200 (MP/UP Border near Village Barahi) of NH-719 in Madhya Pradesh on Hybrid Annuity Mode (Package2).
Supply, Installation, and Commissioning of Solar Street Lights and High Mast Lights at identified locations for Road Safety Mitigation Measures on Balasore-Kharagpur section of NH-16
Engagement of Authority Engineer for O and M including construction of Elephant Underpass, Flyover, 2 nos. Box Culverts, Road Safety works and other related works of Kharagpur-Chichra section of NH-49 the State of West Bengal on EPC Mode
Permanent Rectification of Accident Spots by Construction of Minor Bridge at Barama, Construction of Service Road near Swahid Madan Rauta Civil Hospital Pathsala and 3 Nos of Foot Over Bridges with Ramps alongwith both sides Service Road section