Loading…
Loading…
363 results • Latest
Upgradation of Existing Four Lane Carriageway to Six Lane from Ch 0.000 (Existing km 0.000) (Kandla) in Gandhidham to Ch 71.350 (Existing km 71.400) (Mundra) near Moti Khakhar (Length 71.350 km) section of NH 41 in Gujarat under Hybrid Annuity Mode
Up-gradation of the missing link of the Amritsar-Jamnagar Economic Corridor between Maliya and Pipaliya section of NH-151A (Length 24.611 km) in the State of Gujarat on HAM
CS for AE for Cons. of GSS at 14.440 and 14.279 (Kawas Patiya) 11.225 24.907 (Abhava Junction) 25.720 (Mindhola Jun.) 27.121 (Khajod Junc.) Paved Shoulders on Hazira Port-Surat-Gujarat/Maharashtra Border Section of NH-53 in Gujarat on EPC Mode.
Rectification of RE Wall at various locations of PKG 29 and Pkg-31 of Delhi-Vadodara Expressway NE-4 in the state of Gujarat at Risk and Cost of existing Contractor
Strengthening and overlay at various stretches of 4 lane Bamanbore to Garamore Section (km 182.600 to km 254.537) of NH-27 in the state of Gujarat under TOT Project at the Risk and Cost of existing Concessionaire
Strengthening and overlay at various stretches of 4 lane Garamore to Samakhiyali Section (km 254.537 to km 306.000) of NH-27 in the state of Gujarat under TOT Project at the Risk and Cost of existing Concessionaire