Loading…
Loading…
352 results • Latest
Authority Engineer Services for Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O) on EPC Mode
Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O) on EPC Mode in the State of Karnataka
Independent Engineer Services for Development, Operation and Maintenance of the Ropeway Project from Kamakhya Railway Station to Kamakhya Temple on DBFOT Mode in the State of Assam.
Independent Engineer Services for Development of the Ropeway system from Govindghat to Hemkund Sahib Ji in the State of Uttarakhand on DBFOT Mode.
Independent Engineer Services for Development of the Ropeway system from Sonprayag to Kedarnath in the State of Uttarakhand on DBFOT Mode
Upgrad of exist. 4L Corridor from Km 71.000 From Purvanchal Expressway to Km 102.000 Start of Ghazipur Zamania Saiyad Raja sec of NH24 TL 30 km in Uttar Pradesh on HAM mode PKG I