Loading…
Loading…
766 results • Recent activity
CS for preparation of DPR and Feasibility report for cons. of 4L tunnel and viaduct (205.26 to km 207.25 TL of tunnel 1.67 km and viaduct 320m) on NH33 and 4L spur connection from IWAI Sahibganj port to NH33(TL 2.8 including 1 ROB) in Jharkhand
Construction of Major Bridge at Ch. 14.020 (RHS) at Pinjore-Nalagarh section on NH 105(Old NH 21A) in the state of Haryana on EPC Mode
Routine Maintenance of Parwanoo-Solan Section NH-22 New NH-05 from Km 67 000 to Km 106 139 in the State of Himachal Pradesh on item rate percentage basis
Construction of Long Term Remedial measures for River Cut bank erosion at 3 nos locations RC17 RC24 RC27 between Kullu Manali section of NH03 old NH 21 in the state of Himachal Pradesh on EPC mode
Providing operating and running maintaining vehicle of higher version 01 nos of Innova Crysta or equivalent 01 nos of Scorpio N or equivalent and 04 nos of Swift Dzire or equivalent as per terms and conditions applicable 3rd Call
Shifting of 400 KV 765 KV electrical transmission lines of PGCIL lines 6lane Amritsar Bathinda Greenfield Section of NH754A from km 39000 to km 93000 Package2