Loading…
Loading…
759 results • Recent activity
Construction of 6 lane flyover for Long Term Safety measures at Chichgadh from Ch. 412.405 to Ch. 414.605 on Wainganga Bridge to CH/MH border section of NH-53 on EPC mode in the state of Maharashtra on EPC mode under RO-NAGPUR.
Construction of 05 nos. of Foot Over Bridge (FOB) in Bilaspur-Pathrapali (Km 0.000 to 53.300 km) section of NH-111 (New NH-130) in the state of Chhattisgarh on EPC mode
IE Services for Construction of 4 laning of Patna-Arrah-Sasaram corridor PKG-2 1.Garhani at Ch.Km73.700 to Patar at Ch.Km84.300 2.Greenfield from Sadisopur at Patna Ring Road (NH-131G) Ch.Km0.000 to Asani Ch Km35.800 of NH-119A in Bihar on HAM Mode
Monthly Basis Cab and Taxi Hiring Service - Without Fuel
Repair and Maintenance of Ropar-Phagwara Road Section of NH-344A from Ch. 81.900 to Ch. 88.000 in the State of Punjab (2nd Call).
TNPL 2.34 kilogram Ream of 500 Sheet 75 gsm A4 size Plain, TNPL 2.34 kilogram Ream of 500 Sheet 75 gsm A4 size Plain Copier Paper