Loading…
Loading…
758 results • Recent activity
Construction of 6-lane Flyover and approaches at the start of Muzaffarnagar Bypass (Km 112.535) including widening of the existing 4lane highway to 6lane from Km 112.880 to Km 115.680 of the Meerut-Haridwar NH-58 in the state of Uttar Pradesh on EPC
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
RFP for Construction of Four Lane Nagpur Katol section of NH353J including Mitigation Structures from Design Ch. 37.000 to Ch. 45.990 (Tiger Corridor-I) in the State of Maharashtra on EPC mode.
Strengthening and Road Safety Measures work of Shiroli Ankali Section from Km 146 790 to Km 182 250 NH 166 in the state of Maharashtra on item rate percentage basis
Const. of 03 nos. of VUPs at Ayodhya Bypass from km 135.120 to km 137.060 L1.940 km of NH27 (old NH-28) for Ayodhya Awas Vikas Parishad on EPC Mode Deposit work basis in Uttar Pradesh.
Upgradation of Existing Two-Lane Carriageway to Two Lane Carriageway with Paved Shoulder from Ch. 665.686 (Existing Km. 665.686) in Khanpur Village to Ch. 710.462 ( Km. 710.483 in Karvad Village (Length 44.776) Sec. of NH-56 in Gujarat on EPC Mode.