Loading…
Loading…
90 results • Recent activity
GI reducer Elbow 3/4" x1", GI reducer Elbow 1/2" x1", GI reducer Elbow 1/2" x3/4", GI reducer Socket 1, 1/2" x2", GI reducer Socket 3/4" x1, 1/2", GI reducer Socket 1/2" x1, l/2", GI reducer Socket 3/4" x1", GI reducer Socket 1/2" x1", GI reducer Socket 1/2" x3/4", GI nipple 2" x4", GI nipple l, l/2" x6", GI nipple 1, 1/2" x4", GI nipple 1, 1/4" x4", GI nipple 1" x4", GI nipple 3/4" x6", GI nipple 3/4" x4", GI nipple 1/2" x6", GI nipple 1/2" x4", GI Elbow 50 mm dia, GI Elbow 32 MM, GI Socket 50mm Dia, GI nipple 1" x6"
LG Ultra HD (3840 x 2160) LCD (Liquid Crystal Display) Professional, LG Ultra HD (3840 x 2160) LCD (Liquid Crystal Display) Professional Large Format Display
APC Line Interactive UPS with AVR of Rating 0.6 KVA With, APC Line Interactive UPS with AVR of Rating 0.6 KVA With Warranty of 2 Years
Repair and re-carpeting road of Switchyard area upto Power House Intake and Bhopal approach road under Indira Sagar Power Station, Narmada Nagar, Distt. Khandwa (M.P.).
Group Term Insurance Service - Permanent Employees; Natural death, Accidental death, Suicide, Animal bite
Self Ballasted LED Lamps (LED Bulb) (V3) Conforming to IS 16102 (Part 2) (Under BIS Scheme - II) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6963675 Dated : 12-12-2025 Bid Document 1/9 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 18000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 21 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : NHDC Ltd Omkareshwar Power Station, Hydro Power, NHDC Limited, Ministry of Power (Nhdc Ltd)