Loading…
Loading…
8 results • Recent activity
Design, Engineering, Procurement, Supply And Construction For Construction Of Four Lane Bridge Including Approaches Over River Brahmaputra Between Dhubri On North Bank And Phulbari On South Bank In Assam/ Meghalaya On NH-127B (Length 19.282 km)
Improvement and widening to two lane with paved shoulder of road from Km 63.700 to Km 75.700 (Total length 12.000 km) i.e. Bamanchara - Srirampur section of NH-208 (Package-IV) in the state of Tripura on EPC basis
Improvement and widening to two lane with paved shoulder of road from Km 49.200 to Km 63.700 (Total length 14.500 km) i.e. Jurichhara - Bamanchara section of NH-208 (Package - III) in the state of Tripura on EPC basis
Improvement and widening to two lane with paved shoulder of road from km 21.100 to km 29.200(Total length 8.100km) i.e. Kailashahar-Fultali section of NH-208(Package-I) in the state of Tripura on EPC basis
Improvement and widening to two lane with paved shoulder of road from Km 29.200 to Km 49.200 (Total length 20.000 km) i.e. Fultali - Jurichhara section of NH-208 (Package-II) in the state of Tripura on EPC basis
Improvement and widening to two lane with paved shoulder of road from Km 75.700 to Km 101.300 (Total length 25.600 km) i.e. Srirampur - Khowai section of NH-208 (Package-V) in the state of Tripura on EPC basis.