Loading…
Loading…
948 results • Recent activity
Supply, installation, testing and fully commissioning of Automatic Weather Station (AWS)
Renovation of DG shed building and Billing Office room of Electrical Infra Division at Executive Director Office Complex Arunachal Pradesh Kolaptukar.
Construction of Gate of Adit-II at Salwad of Parbati-III Power Station
Grouting work of Pressure Shaft at Parbati-III Power Station during lean Period of 2025-26
55 SMART ULTRA HD LED TV, 65 INCH UHD LED TV, MOTORIZED PROJECTION SCREEN, PTZ VIDEO CONFERENCING CAMERA, CENTER CONTROLER UNIT, PA CHAIRMAN UNIT CONFERENCE SYSTEM, PA DELEGATE UNIT CONFERENCE SYSTEM, WIRELESS LAPEL MICROPHONE, RJ45 DISTRIBUTOR SWITCH, PATCH CORD 2 MTR CAT 6A, PATCH CORD CAT6 20 METERS, DIGITAL SIGNAL PROCESSER DSP UNIT, AUDIO POWER AMPLIFIER, WALL MOUNT SPEAKER, CEILING SPEAKER, USB 3.0 CABLE MALE TO FEMALE 10 METER, HDMI SWITCHER, HDMI EXTENDER SPLITTER, CONTROL KEYPAD, 8 PORT POE SWITCH, 17U LOCKABLE RACK WITH PDU AND COOLING FAN, CAMERA MOUNTING KIT, CABLES, CONNECTORS AND OTHER FIXTURE CONSUMABLES, INSTALLATION CHARGES Installation Testing and Commissioning of above equipments and Programming of DSP
Repair work of water conductor system (Head Race Tunnel) of Parbati-III Power Station during lean Period of 2025-26