Loading…
Loading…
88 results • Recent activity
Repairing of (A) Replacement of bottom wear plates and repairing of damaged bottom plates of tub base (B) Repairing of Major cracks developed in Jib head pulley assembly (C) Repairing of Cracks at various places in A Frame Boom Assembly (D) Repairing
Replacement of swing rack segments assembly and dismantling , refitment of bearing stands, rope drums and complete hoist and drag gear box ESH 20/90 Matang Dragline at Nigahi Project.
Offloading the job of re-pair and maintenance work of 02 Nos. CAT D11T, 850HP Dozers having Sl No. T-0645 and T-0667 for a period of 2 year (730 days) at Nigahi Project
Collection of burnt oil at Dumper sections ( NWS and OWS), Auxil-iary Equipment sec-tion and Dozer section (NEW OLD) work-shop and transporta-tion to Regional store including collection of material from store on daily basis for a period of 730 day
Repair, rehabilitation and retro fitting of dumper repair shed of Old Workshop at Nigahi Project
Providing and fixing gabion boxes and OB filled PVC bags at different places in mine and at toe of external dumps at Nigahi Project