Loading…
Loading…
839 results • Recent activity
SM499050083: Housing With Plunger Of Lincoln Make Type - Sa-V & Part No. 7363-03046-1., SM499050052: 4/2 Way Electrically Operated Change Over Valve Sa-V Type, Delimon Make Part No. 34133, SM499050043: End Of Line Switch Assembly For Grease Lubrication System Delimon Make Part No. Sg-A 34, SM499050045: Non-Return Valve For Ha-Iii Grease Pump Of Delimon Make Part No. 63613- 2311 (Or) Lincol, SM499050047: Pressure Relief Valve For Grease Lubrication System Delimon Make Part No. Sa G 38131- 2, SM499050055: Male Stud Coupling Body (Adaptor) For Hydraulic System As Per Is-8801-1978 For 10 Mm Od
SKF 6303-2Z Single Row Deep Groove Ball Bearing
11KV/500A EPOXY HOUSING FOR COUPLER
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover
CO350100327-LOW CEMENT REFRACTORY GUNNING MATERIAL (LC GUN– 60) FOR CFBC BOILER
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6846164 Dated : 03-11-2025 Bid Document 1/8 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority BUREAU VERITAS INDIA PRIVATE LIMITED Quality Assurance Plan document 1761973108.pdf Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 16 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : UNIT HEAD/MMC Materials Management, NLC India Limited, Ministry of Coal (General Manager)